Cases / Project case study

Malpasset Dam — abutment wedge failure and uplift

The arch dam failed after instability developed in its rock foundation. The French dam committee and government accident record describe the role of discontinuity geometry, uplift and stress-dependent drainage.

Rock slopes and foundationsDams and leveesSeepage and internal erosionSite investigation
Ruins of Malpasset Dam photographed in 2007.
Ruins of Malpasset Dam photographed in 2007. The remaining concrete and rock setting belong to the actual 1959 failure site.Bonho1962 · Image source · Public domain

Project evidence

Design & engineering

Partial record

The English technical material supports a forensic rock-wedge study. It is not an as-built remediation proposal for the ruined dam.

Sources: s1 · s2

Cost & estimating

Not located in cited sources

A project-specific estimate, bid schedule or final account was not found in the reviewed sources.

Schedule & construction

Not located in cited sources

A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.

Completion & performance

Not located in cited sources

Complete as-built drawings and acceptance records were not found in the reviewed sources.

Engineering methods

Rock-wedge stabilityUplift pressureStress-dependent permeability

Suggested teaching exercise

Capstone project brief

Evaluate an arch-dam abutment where intersecting discontinuities create a potentially unstable rock wedge.

Starting information & inputs

  • Extract the reported fault, foliation and abutment-force relationships.
  • Separate known observations from later interpretations of permeability changes.

Suggested deliverables

  • Calculate wedge stability for several groundwater-pressure distributions.
  • Specify investigation and drainage verification that could discriminate between the competing assumptions.
  • A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.
  • A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points.

Design questions

  • How can increased compressive stress reduce drainage yet raise destabilizing uplift?
  • Why may strong intact rock still provide an inadequate dam abutment?

The brief is a proposed educational exercise based on the cited project, not the original designer's instruction or a complete construction document set.

Sources & original records

Government accident review ↗

French Ministry environmental accident database

public-link · Publisher-hosted; redistribution permission not established · Checked 2026-11-22
Barrage Malpasset 2007.jpg — image and reuse license ↗

Wikimedia Commons / Bonho1962 · 2007

Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.

public-link · Public domain · Checked 2026-11-22