Virginia Route 288 — drilled-shaft quality evaluation

This design-build highway case documents drilled-shaft assessment using crosshole sonic logging and pile-integrity tests, including construction anomalies.

Piles and drilled shaftsSite investigationMonitoring and observational designEstimating, sequencing and project delivery
Microcamera photograph of defective concrete inside a Route 288 drilled shaft, from the project evaluation paper’s Figure 9. This is the actual shaft inspection, rather than an exterior bridge view.
Microcamera photograph of defective concrete inside a Route 288 drilled shaft, from the project evaluation paper’s Figure 9. This is the actual shaft inspection, rather than an exterior bridge view.Emad Farouz, Paul Landers and Scott Webster (2004) · Image source · CC BY-NC-ND 4.0 — noncommercial, unchanged reproduction

Project evidence

Design & engineering

Partial record

The technical paper addresses foundation evaluation and test interpretation; it is not the complete bridge design package.

Sources: s1

Cost & estimating

Not located in cited sources

A project-specific estimate, bid schedule or final account was not found in the reviewed sources.

Schedule & construction

Not located in cited sources

A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.

Completion & performance

Partial record

Published test and anomaly discussions support a quality-control exercise; the complete acceptance register is not included.

Sources: s1

Engineering methods

Drilled shaftsCrosshole sonic loggingPile integrity testing

Suggested teaching exercise

Capstone project brief

Develop an inspection and acceptance plan for drilled shafts, including how to investigate an anomalous test result before deciding on remediation.

Starting information & inputs

  • Identify the shaft construction method, test types and reported anomalies.
  • Separate an instrument anomaly from an independently confirmed physical defect.

Suggested deliverables

  • Prepare a shaft inspection checklist and evidence-based test decision tree.
  • Design a supplemental investigation and a repair-verification programme for a selected anomaly.
  • A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.
  • A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points.

Design questions

  • Which site data control the decision, and what additional investigation would reduce uncertainty?
  • How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?

The brief is a proposed educational exercise based on the cited project, not the original designer's instruction or a complete construction document set.