West Davis Highway ramp — lightweight fill beside live transport
UDOT used geofoam blocks for the ramp connecting West Davis Highway to southbound I-15, with existing transport infrastructure constraining allowable settlement.
Foundation Design · Cases
Documented projects, design decisions and lessons for engineering practice and capstone studies.
17 of 117 project case studies
UDOT used geofoam blocks for the ramp connecting West Davis Highway to southbound I-15, with existing transport infrastructure constraining allowable settlement.
A distribution-centre site on former strip-mine ground combined dynamic compaction with aggregate piers where wet, weak areas did not respond adequately.
Repeat topographic and radar observations document the coastal landslide that destroyed part of Highway 1 in May 2017 and the continuing changes around its margins.
Reservoir drawdown, dam removal and sediment excavation/capping were coordinated with river restoration and replacement of affected water-supply wells.
Long-term monitoring examines an evapotranspiration-capillary barrier intended to limit infiltration into waste. The annual report also discusses side-slope edge effects.
The highway used fill placement and separation geotextile to protect permafrost, with much construction undertaken in winter.
Twelve embankment test sections compared air-convection shoulder geometry and rock classes over thaw-unstable permafrost near milepost 219.
Field and laboratory work investigated heave of a relatively young pavement over compacted clay shale and distinguished wetting expansion from a suspected sulfate reaction.
A TxDOT-funded project investigated swelling clay beneath distressed pavement sections and evaluated characterization and stabilization alternatives.
Following Hurricane Michael, roadway reconstruction incorporated articulated concrete blocks over filter fabric and bedding to reduce recurring embankment erosion.
After the 2019 flood damaged the road embankment, Iowa DOT selected anchored concrete-block matting and evaluated recurring-damage economics.
The artificial island’s reclaimed sand was treated by vibrocompaction before infrastructure construction. The project’s visitor centre explains the working sequence and its role in controlling settlement and liquefaction susceptibility.
The main and auxiliary dams were modified to address combined seismic, seepage and flood-passage concerns. Owner records describe dam raises, downstream buttress work, filters, drainage and major spillway excavation.
Instrumented railway embankments provide evidence on the cooling and deformation of crushed-rock configurations. Researchers compare thermal performance, sunny/shady slope effects and continuing permafrost change.
Rehabilitated waste areas form parkland above engineered containment. The authority describes the continuing management of landfills and a wetland-based system for treating collected leachate.
Constrained highway construction used retaining structures in a river canyon. The reinforced-wall studies examine movement over compressible deposits and the importance of separating reinforced-fill performance from foundation settlement.
The remediated site retains engineered landfill covers, groundwater collection/treatment systems and long-term inspections. Public surveillance records support a capstone on containment performance after closure.
| Title | Type | Owner / location | Year | Access |
|---|---|---|---|---|
| West Davis Highway ramp — lightweight fill beside live transport | Design and construction | Utah Department of TransportationFarmington, Utah | 2023 | Study materials |
| Olyphant distribution centre — variable mine-spoil improvement | Design and construction | D&L RealtyOlyphant, Pennsylvania | 2022 | Study materials |
| Mud Creek, Highway 1 — landslide mapping and road recovery | Forensic investigation | Caltrans / USGS and NASA investigation partnersBig Sur, California | 2017 | Study materials |
| Milltown Reservoir — dam removal and contaminated sediment remediation | Remediation and restoration | US EPA / Montana and responsible-party partnersMissoula County, Montana | 2009 | Study materials |
| Prototype Hanford Barrier — long-term infiltration control | Field demonstration | US Department of Energy / PNNLHanford Site, Washington | 2024 | Study materials |
| Inuvik–Tuktoyaktuk Highway — embankment over permafrost | Design and construction | Government of the Northwest TerritoriesNorthwest Territories | 2017 | Study materials |
| Dalton Highway MP 209–222 — air-convection embankment trial | Field demonstration | Alaska Department of Transportation and Public FacilitiesAlaska | 2022 | Study materials |
| KY 499, Estill County — pavement swelling investigation | Forensic investigation | Kentucky Transportation Cabinet / University of KentuckyEstill County, Kentucky | 2005 | Study materials |
| Texas SH 6 and SH 21 — expansive-subgrade distress | Forensic investigation | Texas Department of Transportation / Texas A&MTexas | 1996 | Study materials |
| US 98, Florida — coastal roadway revetment | Rehabilitation | Florida Department of TransportationFlorida Panhandle | 2018 | Original documents |
| US 34, Iowa — flood-resistant embankment matting | Rehabilitation | Iowa Department of TransportationMills County, Iowa | 2021 | Original documents |
| Palm Jumeirah — densification of reclaimed sand | Design, construction and performance | NakheelDubai | 2006 | Study materials |
| Isabella Dam modifications — seismic, seepage and spillway risk | Design, construction and performance | US Army Corps of EngineersKern County, California | 2023 | Study materials |
| Qinghai–Tibet Railway — crushed-rock embankments over warming permafrost | Design, construction and performance | Qinghai–Tibet RailwayQinghai–Tibet Plateau | 2020 | Study materials |
| Sydney Olympic Park — engineered waste mounds and leachate management | Design, construction and performance | Sydney Olympic Park AuthorityHomebush Bay, New South Wales | 2022 | Study materials |
| Glenwood Canyon — reinforced walls on compressible foundations | Design, construction and performance | Colorado Department of TransportationI-70, Colorado | 1992 | Study materials |
| Rocky Flats — engineered covers and long-term groundwater care | Design, construction and performance | U.S. Department of Energy, Office of Legacy ManagementColorado Front Range | 2026 | Original documents |
Each case separates documented project decisions and available records from a suggested capstone exercise. Missing final designs, costs, schedules or completion records are identified. A teaching exercise may require additional assumptions, site investigation or instructor-supplied inputs.
Projects may address several topics. Counts below represent relevant project records, not independent examples for every method.