Inuvik–Tuktoyaktuk Highway — embankment over permafrost

The highway used fill placement and separation geotextile to protect permafrost, with much construction undertaken in winter.

Permafrost and cold regionsEarthworks and pavement subgradesExpansive, collapsible and organic soilsMonitoring and observational design
The Inuvik–Tuktoyaktuk Highway through the Caribou Hills north of Inuvik.
The Inuvik–Tuktoyaktuk Highway through the Caribou Hills north of Inuvik. Photograph of the actual permafrost-road project corridor.Samuell · Image source · CC BY 4.0

Project evidence

Design & engineering

Partial record

The owner describes the construction strategy; a Canadian geological report documents regional ground temperatures before and after construction.

Sources: s1 · s2

Cost & estimating

Not located in cited sources

A project-specific estimate, bid schedule or final account was not found in the reviewed sources.

Schedule & construction

Partial record

The owner project page documents opening and winter construction strategy; use source milestones rather than an assumed year-round programme.

Sources: s1 · s2

Completion & performance

Partial record

The owner page and regional ground-temperature report support performance review.

Sources: s1 · s2

Engineering methods

Permafrost preservationFill-only constructionThermal monitoring

Suggested teaching exercise

Capstone project brief

Develop an embankment concept for ice-rich permafrost and compare seasonal construction and thaw-settlement risk.

Starting information & inputs

  • Extract the owner’s construction constraints and select a monitored ground-temperature location.
  • Record how ground-ice and soil-property information differ along the alignment.

Suggested deliverables

  • Prepare a thermal/thaw-settlement screening model and sensitivity to warming and drainage.
  • Plan borrow, winter hauling, geotextile placement and long-term temperature monitoring.
  • A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.
  • A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points.

Design questions

  • Which site data control the decision, and what additional investigation would reduce uncertainty?
  • How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?

The brief is a proposed educational exercise based on the cited project, not the original designer's instruction or a complete construction document set.

Sources & original records

ITH Caribou Hills.jpg — image and reuse license ↗

Wikimedia Commons / Samuell · 2021

Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.

public-link · CC BY 4.0 · Checked 2026-11-22