Boston Central Artery/Tunnel — deep mixing and ground movement
Project research documents deep mixing in marine clay at Bird Island Flats and Fort Point Channel and the control of excavation-induced movements.
Foundation Design · Cases
Documented projects, design decisions and lessons for engineering practice and capstone studies.
17 of 117 project case studies
Project research documents deep mixing in marine clay at Bird Island Flats and Fort Point Channel and the control of excavation-induced movements.
The bored-tunnel replacement passed beneath downtown Seattle. Owner material includes geology/soils assessment, procurement information and completion history.
Project-authored learning-legacy papers describe settlement mitigation and monitoring around Farringdon, including the response of Lindsey Street Bridge.
Deep tunnel sections encountered squeezing rock and strongly variable geological behavior. The Swiss geotechnical society’s project history explains both anticipated and unexpected support challenges at Sedrun and Faido.
The alignment sought low-permeability marly chalk while accommodating more fractured ground on the French side. Project geologists describe how marine seismic surveys and boreholes informed route selection and machine requirements.
The immersed crossing combined a gravel foundation, under-base grouting and treatment of liquefiable deposits. A project paper explains element connections and the transition to adjacent bored tunnels under severe seismic demands.
The road tunnel passes through rock and marine sediments at high water pressure. The designers describe slurry-shield excavation, specialized lining details and seismic joints near changes in ground stiffness.
The sewer tunnel crosses the London Basin sequence from clay into water-bearing chalk. Project engineers explain how geological observations and groundwater pressure influenced excavation methods and construction performance.
Deep circular shafts and a slurry-driven tunnel connected Abbey Mills and Beckton. The foundation contractor describes diaphragm-wall design, fractured chalk and flint bands encountered during shaft construction.
Unexpected poor ground near the east running-tunnel launch required a revised sequence. The construction manager describes soil freezing while the TBM first advanced through the western alignment.
A short mined connection beneath active transport infrastructure used a frozen soil arch for temporary support and groundwater cutoff. The project sources distinguish local freezing from the wider East Side Access tunnel programme.
Artificial islands connect a long immersed crossing founded above variable soft deposits. Project papers describe composite foundation treatment, island formation and full-scale testing near transition zones.
The combined stormwater and road tunnel passes through highly irregular limestone and overlying deposits. The builder and ground-treatment contractor describe slurry-shield excavation, grouting and sinkhole-management challenges.
The urban rail link traverses weak rock, younger sediments, volcanic material and reclamation. Project engineers describe how phased investigations and a shared three-dimensional ground model informed procurement and risk allocation.
The extension combines bored tunnels with deep station boxes and nearby developments. Owner settlement commitments and designer accounts link prediction, condition surveys and construction monitoring.
The capacity upgrade required new tunnels beside operating infrastructure and existing building piles. The designer describes staged building-impact assessment and a load-transfer solution that retained foundation reuse options.
The Seed Vault upgrade replaced its access tunnel with a watertight concrete structure and moved heat-producing services. The construction account includes artificial ground freezing to support the replacement works.
| Title | Type | Owner / location | Year | Access |
|---|---|---|---|---|
| Boston Central Artery/Tunnel — deep mixing and ground movement | Design and construction | Massachusetts highway agenciesBoston, Massachusetts | 2006 | Study materials |
| Seattle SR 99 tunnel — soft-ground tunnelling and settlement | Design and construction | Washington State Department of TransportationSeattle, Washington | 2019 | Study materials |
| Crossrail Farringdon — compensation grouting near existing assets | Design and construction | CrossrailLondon, England | 2016 | Study materials |
| Gotthard Base Tunnel — squeezing rock and adaptive support | Design, construction and performance | AlpTransit GotthardSwiss Alps | 2016 | Study materials |
| Channel Tunnel — geological alignment and water-pressure control | Design, construction and performance | EurotunnelEnglish Channel | 1994 | Study materials |
| Marmaray crossing — immersed-tunnel foundations in seismic ground | Design, construction and performance | Republic of Türkiye transport authoritiesBosphorus, Istanbul | 2013 | Study materials |
| Eurasia Tunnel — high-pressure mixed-ground TBM crossing | Design, construction and performance | Eurasia Tunnel concession / transport authorityBosphorus, Istanbul | 2016 | Study materials |
| Thames Tideway Tunnel — variable geology and deep shafts | Design, construction and performance | TidewayLondon | 2022 | Study materials |
| Lee Tunnel — diaphragm-wall shafts in water-bearing chalk | Design, construction and performance | Thames WaterEast London | 2017 | Study materials |
| Second Avenue Subway Phase 1 — ground freezing at a TBM launch | Design, construction and performance | Metropolitan Transportation AuthorityManhattan, New York | 2017 | Study materials |
| East Side Access — frozen support beneath Northern Boulevard | Design, construction and performance | Metropolitan Transportation AuthorityQueens, New York | 2013 | Study materials |
| Hong Kong–Zhuhai–Macao crossing — immersed-tunnel settlement transitions | Design, construction and performance | Hong Kong–Zhuhai–Macao Bridge AuthorityPearl River estuary | 2018 | Study materials |
| SMART Tunnel — tunnelling through urban karst | Design, construction and performance | Department of Irrigation and Drainage / Malaysian Highway AuthorityKuala Lumpur | 2007 | Study materials |
| Auckland City Rail Link — ground models and settlement baselines | Design, construction and performance | City Rail Link LimitedCentral Auckland | 2023 | Study materials |
| Northern Line Extension — settlement assessment and station-box interfaces | Design, construction and performance | Transport for LondonKennington to Battersea, London | 2021 | Study materials |
| Bank station upgrade — tunnelling through existing pile zones | Design, construction and performance | London UndergroundCity of London | 2023 | Study materials |
| Svalbard Seed Vault — tunnel waterproofing and frozen ground | Design, construction and performance | Norwegian Ministry of Agriculture and Food / StatsbyggLongyearbyen, Svalbard | 2019 | Study materials |
Each case separates documented project decisions and available records from a suggested capstone exercise. Missing final designs, costs, schedules or completion records are identified. A teaching exercise may require additional assumptions, site investigation or instructor-supplied inputs.
Projects may address several topics. Counts below represent relevant project records, not independent examples for every method.