River Road, Tucson — tall soil-nailed cuts
Road widening beneath developed bluffs used tall soil-nailed walls. Loose seams and constrained investigation access required construction responses.
Foundation Design · Cases
Documented projects, design decisions and lessons for engineering practice and capstone studies.
15 of 117 project case studies
Road widening beneath developed bluffs used tall soil-nailed walls. Loose seams and constrained investigation access required construction responses.
Project research documents deep mixing in marine clay at Bird Island Flats and Fort Point Channel and the control of excavation-induced movements.
The bored-tunnel replacement passed beneath downtown Seattle. Owner material includes geology/soils assessment, procurement information and completion history.
Project-authored learning-legacy papers describe settlement mitigation and monitoring around Farringdon, including the response of Lindsey Street Bridge.
The auxiliary spillway required major rock excavation and preparation of the control-structure foundation before concrete placement.
Published studies of the tower foundation examine excavation heave, reloading and pile–raft interaction. They offer a useful comparison between simplified foundation springs and coupled settlement analyses.
The integrated resort was constructed on reclaimed waterfront land. The foundation contractors describe bored piling and advance removal of a buried seawall within a tightly constrained site.
The transit-center excavation required a stiff, low-permeability perimeter and protection of nearby foundations. Public authority records explain proposed test shafts, soil improvement and groundwater concerns during design.
The excavation engineer describes a staged support system using deep soil-mixed soldier walls, internal bracing, jet-grouted shafts, a secant-pile ring and tiebacks. Artesian pressure and nearby structures governed key design checks.
The existing concrete dam was raised using roller-compacted concrete. Owner documents connect excavation to competent rock, treatment of localized poor material and seepage control with the enlarged structure.
Construction removed river deposits to competent rock and treated the foundation and abutments. Later drainage and remedial grouting addressed uplift and leakage observed during initial reservoir filling.
Deep circular shafts and a slurry-driven tunnel connected Abbey Mills and Beckton. The foundation contractor describes diaphragm-wall design, fractured chalk and flint bands encountered during shaft construction.
Redevelopment beside St Paul’s Cathedral required assessment of groundwater changes in shallow deposits supporting the historic structure. The designer describes conceptual and numerical groundwater modeling followed by construction monitoring.
The extension combines bored tunnels with deep station boxes and nearby developments. Owner settlement commitments and designer accounts link prediction, condition surveys and construction monitoring.
The official inquiry identified errors in retaining-wall and strut-connection design and failures to respond adequately to warning signs. The case joins ground-model selection, temporary-structure detailing and construction governance.
| Title | Type | Owner / location | Year | Access |
|---|---|---|---|---|
| River Road, Tucson — tall soil-nailed cuts | Design and construction | Pima County Department of TransportationPima County, Arizona | 2004 | Study materials |
| Boston Central Artery/Tunnel — deep mixing and ground movement | Design and construction | Massachusetts highway agenciesBoston, Massachusetts | 2006 | Study materials |
| Seattle SR 99 tunnel — soft-ground tunnelling and settlement | Design and construction | Washington State Department of TransportationSeattle, Washington | 2019 | Study materials |
| Crossrail Farringdon — compensation grouting near existing assets | Design and construction | CrossrailLondon, England | 2016 | Study materials |
| Folsom auxiliary spillway — rock excavation and foundation preparation | Design and construction | USACE / Bureau of ReclamationFolsom, California | 2017 | Study materials |
| Shanghai Tower — excavation compensation and pile–raft interaction | Design, construction and performance | Shanghai Tower Construction and DevelopmentShanghai | 2015 | Study materials |
| Marina Bay Sands — deep foundations on reclaimed ground | Design, construction and performance | Marina Bay SandsMarina Bay, Singapore | 2010 | Study materials |
| Transbay Transit Center — deep excavation beside existing foundations | Design, construction and performance | Transbay Joint Powers AuthoritySan Francisco | 2010 | Study materials |
| Salesforce Tower — staged excavation and artesian-pressure control | Design, construction and performance | Salesforce Tower development teamSan Francisco | 2018 | Study materials |
| San Vicente Dam raise — rock preparation and RCC interface | Design, construction and performance | San Diego County Water AuthoritySan Diego County, California | 2014 | Study materials |
| Hoover Dam — rock-foundation preparation and remedial grouting | Design, construction and performance | US Bureau of ReclamationColorado River, Nevada–Arizona | 1947 | Study materials |
| Lee Tunnel — diaphragm-wall shafts in water-bearing chalk | Design, construction and performance | Thames WaterEast London | 2017 | Study materials |
| One New Change — basement effects on St Paul’s groundwater | Design, construction and performance | Land SecuritiesCity of London | 2010 | Study materials |
| Northern Line Extension — settlement assessment and station-box interfaces | Design, construction and performance | Transport for LondonKennington to Battersea, London | 2021 | Study materials |
| Nicoll Highway collapse — excavation design and monitoring decisions | Failure investigation and lessons | Singapore Land Transport Authority / Committee of InquirySingapore | 2004 | Study materials |
Each case separates documented project decisions and available records from a suggested capstone exercise. Missing final designs, costs, schedules or completion records are identified. A teaching exercise may require additional assumptions, site investigation or instructor-supplied inputs.
Projects may address several topics. Counts below represent relevant project records, not independent examples for every method.