Foundation Design · Cases

Find Engineering Cases

Documented projects, design decisions and lessons for engineering practice and capstone studies.

Owner, location & access
Clear filters

25 of 117 project case studies

The Mud Creek landslide on California’s Big Sur coast in May 2017.

Caltrans / USGS and NASA investigation partners · 2017

Mud Creek, Highway 1 — landslide mapping and road recovery

Repeat topographic and radar observations document the coastal landslide that destroyed part of Highway 1 in May 2017 and the continuing changes around its margins.

Soil slopes and landslidesCoastal and offshore foundationsMonitoring and observational design
The articulating concrete-block revetment beside US 98 in Florida, shown in Figure 3 of the FHWA case study.

Florida Department of Transportation · 2018

US 98, Florida — coastal roadway revetment

Following Hurricane Michael, roadway reconstruction incorporated articulated concrete blocks over filter fabric and bedding to reduce recurring embankment erosion.

Scour and erosion protectionCoastal and offshore foundationsReinforced soil and geosynthetics
Satellite view of Kansai International Airport and its reclaimed offshore island works.

Kansai Airports · 2025

Kansai International Airport — reclamation and long-term settlement

An offshore airport on deep marine deposits combines accelerated consolidation with ongoing settlement observation and adjustable building supports. The operator publishes measured island subsidence and its mitigation approach.

Settlement and consolidationGround improvementExpansive, collapsible and organic soils
Historical aerial photograph of the enclosed Changi East slurry pond before reclamation.

Singapore reclamation authorities · 2005

Changi East reclamation — instrumented vertical-drain design

The reclamation programme used prefabricated vertical drains to accelerate consolidation of marine clay. Its investigators publish pilot trials, specialized testing and interpretation of settlement and pore-pressure records.

Settlement and consolidationGround improvementLaboratory testing and parameters
Aerial view of the Port of Brisbane and adjoining airport in 2015.

Port of Brisbane · 2009

Port of Brisbane — vacuum consolidation beside a marine park

A reclamation trial combined vacuum preloading and vertical drainage in soft dredged mud and underlying clay. A cutoff isolated permeable layers, while stability at the adjacent marine park constrained surcharge filling.

Ground improvementSettlement and consolidationSeepage and internal erosion
Palm Jumeirah viewed from a helicopter in May 2008.

Nakheel · 2006

Palm Jumeirah — densification of reclaimed sand

The artificial island’s reclaimed sand was treated by vibrocompaction before infrastructure construction. The project’s visitor centre explains the working sequence and its role in controlling settlement and liquefaction susceptibility.

Ground improvementCoastal and offshore foundationsEarthquakes and liquefaction
Aerial view of construction at the IHNC–Lake Borgne Surge Barrier in eastern New Orleans.

Flood Protection Authority East / USACE · 2013

Lake Borgne surge barrier — pile-supported flood protection

The barrier combines a long pile-supported wall with navigation gates and levee connections. The geotechnical consultant describes capacity, settlement, global stability and temporary-works analyses in soft coastal deposits.

Piles and drilled shaftsLateral foundations and interactionCoastal and offshore foundations
The West Closure Complex during its 2023 annual operational testing.

US Army Corps of Engineers · 2011

West Closure Complex — foundations on soft deltaic deposits

The gate and pumping complex is founded in soft, compressible deltaic deposits. USACE authors describe exploration, laboratory characterization and pile testing used to develop design strength profiles.

Piles and drilled shaftsLaboratory testing and parametersSite investigation
Interior of the Marmaray tunnel project in 2012.

Republic of Türkiye transport authorities · 2013

Marmaray crossing — immersed-tunnel foundations in seismic ground

The immersed crossing combined a gravel foundation, under-base grouting and treatment of liquefiable deposits. A project paper explains element connections and the transition to adjacent bored tunnels under severe seismic demands.

Tunnels and underground worksEarthquakes and liquefactionGround improvement
Liquefaction damage in Minatojima-Nakamachi on Kobe’s Port Island on 17 January 1995.

Port of Kobe / Japanese port researchers · 1995

Kobe Port — quay-wall displacement during liquefaction

Many caisson quay walls moved seaward during the 1995 earthquake. Port researchers studied the combined contributions of inertia and excess pore pressure beneath and behind the walls.

Earthquakes and liquefactionRetaining walls and anchorsCoastal and offshore foundations
July 2024 aerial photograph of the Randle Reef sediment containment facility in Hamilton Harbour.

Canada Water Agency and project partners · 2026

Randle Reef — harbour sediment containment and final capping

Contaminated harbour sediment is managed within a double-walled engineered containment facility. The owner separates wall construction, dredging and the later environmental cap and structural works.

Contaminated ground and waste barriersCoastal and offshore foundationsRetaining walls and anchors
Aerial view of the Port of Anchorage, now the Don Young Port of Alaska.

Don Young Port of Alaska · 2020

Port of Alaska — test piles and seismic waterfront foundations

Modernization studies used offshore investigation and a test-pile programme to examine drivability, capacity and underwater noise. The petroleum/cement terminal team also characterized cyclic behavior and soil–structure interaction.

Piles and drilled shaftsLateral foundations and interactionLaboratory testing and parameters
Sutong Bridge during construction. The image shows the actual crossing; detailed shaft groups, pile-cap geometry and scour protection are described in the project engineering papers.

Sutong Bridge project authorities · 2008

Sutong Bridge — deep pile groups and riverbed scour protection

The main pylons use large groups of long drilled shafts in deep water and soft ground. Project papers connect testing, pile-group analysis, post-grouting, cofferdam construction and permanent scour protection.

Piles and drilled shaftsLateral foundations and interactionScour and erosion protection
The Osman Gazi Bridge across Izmit Bay. The buried and submerged foundation details are documented in the linked design and construction sources.

Gebze–Orhangazi–Izmir motorway project · 2016

Osman Gazi Bridge — seismic caissons on gravel beds

The suspension bridge combines offshore caisson foundations with improved ground and a gravel interface intended to accommodate extreme seismic movement. Published accounts describe soil–structure interaction and marine installation.

Lateral foundations and interactionEarthquakes and liquefactionGround improvement
Hywind Scotland photographed from the sea on 22 June 2022. The turbine spars are visible above the water; the suction anchors and mooring arrangements are described in the linked project records.

Equinor / Masdar · 2017

Hywind Scotland — suction anchors for floating wind

Five floating turbines use mooring systems connected to seabed suction anchors. Project and decommissioning material support an integrated study of anchor capacity, installation, inspection and eventual removal.

Coastal and offshore foundationsLateral foundations and interactionSite investigation
The Eastern Scheldt storm-surge barrier viewed from Westerschouwen in January 2025. Its submerged foundation mats and scour-protection layers are explained in the engineering sources, rather than inferred from this surface view.

Rijkswaterstaat · 1986

Eastern Scheldt Barrier — foundation mats and scour resilience

The movable barrier retains tidal exchange while closing during severe water levels. Its foundation and bed-protection concepts provide a case on erosion resistance, interface stability and long-term renewal of marine structures.

Coastal and offshore foundationsShallow foundationsScour and erosion protection

From project evidence to a design study

Each case separates documented project decisions and available records from a suggested capstone exercise. Missing final designs, costs, schedules or completion records are identified. A teaching exercise may require additional assumptions, site investigation or instructor-supplied inputs.

Topic coverage

Projects may address several topics. Counts below represent relevant project records, not independent examples for every method.