Cases / Project case study

Beaver Dam Wash Bridge — scour-resistant replacement

Flood damage and channel migration prompted comparison of replacement spans and erosion protection at the County Road 91 crossing.

Scour and erosion protectionPiles and drilled shaftsCoastal and offshore foundationsEstimating, sequencing and project delivery
The replacement Beaver Dam Wash Bridge, shown in Figure 4 of the FHWA resilience case study.
The replacement Beaver Dam Wash Bridge, shown in Figure 4 of the FHWA resilience case study.Mohave County, published by FHWA · Image source · No open reuse license verified; original copyright retained

Project evidence

Design & engineering

Partial record

The FHWA case documents the selected longer bridge and gabion training-dike approach, with alternatives and economic justification.

Sources: s1

Cost & estimating

Partial record

The source reports $6.5 million for resilience improvements; use its stated scope when comparing alternatives.

Sources: s1

Schedule & construction

Partial record

The damaging event occurred in 2005; the case describes emergency access followed by replacement planning.

Sources: s1

Completion & performance

Partial record

The case records the selected resilience solution and lessons learned.

Sources: s1

Engineering methods

Channel migrationScour protectionBridge alternatives

Published quantities & cost references

These values retain the scope and date basis of their cited source. Estimates, alternatives and partial packages are identified individually.

Source-backed project quantities and costs
ItemReported valueScope & source
Resilience-improvement cost6,500,000 USDBridge-replacement resilience measures in the case summary.As reported; no escalation or inflation adjustment.Source s1 · Project Snapshot

Suggested teaching exercise

Capstone project brief

Develop a crossing concept that addresses both local foundation scour and movement of the channel approaching the bridge.

Starting information & inputs

  • Extract the replacement alternatives, channel-change observations and protection measures.
  • Identify missing hydraulic and geotechnical inputs for a detailed design.

Suggested deliverables

  • Compare foundation depth and protection footprints for the alternatives.
  • Prepare a training-dike concept and a life-cycle maintenance/inspection plan.
  • A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.
  • A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points.

Design questions

  • Which site data control the decision, and what additional investigation would reduce uncertainty?
  • How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?

The brief is a proposed educational exercise based on the cited project, not the original designer's instruction or a complete construction document set.