An eroding coastal bluff was treated using launched fiberglass soil nails, facing and drainage under restricted site access.
Project evidence
Design & engineering
Partial recordThe case describes nail arrangement, drainage galleries and installation adjustments. Its specialty nail system needs method-specific verification.
Cost & estimating
Not located in cited sourcesA project-specific estimate, bid schedule or final account was not found in the reviewed sources.
Schedule & construction
Partial recordThe case records a five-week construction period spanning December 2008 and January 2009.
Completion & performance
Partial recordConstruction observations and photographs are linked at the source.
Engineering methods
Suggested teaching exercise
Capstone project brief
Compare drainage and reinforcement alternatives for a coastal bluff supporting a road, including corrosion and erosion exposure.
Starting information & inputs
- Extract the exploration description and installation constraints.
- Identify shoreline loading and future erosion information needed beyond the case.
Suggested deliverables
- Develop a stability/drainage concept and distinguish launched nails from drilled-and-grouted nails.
- Specify a trial installation, acceptance testing and long-term inspection plan.
- A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.
- A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points.
Design questions
- Which site data control the decision, and what additional investigation would reduce uncertainty?
- How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?