public-link · Publisher-hosted; redistribution permission not established · Checked 2026-11-22Hywind Scotland — suction anchors for floating wind
Five floating turbines use mooring systems connected to seabed suction anchors. Project and decommissioning material support an integrated study of anchor capacity, installation, inspection and eventual removal.
Project evidence
Design & engineering
Partial recordProject sources describe the spar, mooring lines and suction anchors; the 2022 decommissioning programme gives asset-specific arrangements. Distinguish the floating turbine substructure from its seabed anchor foundation and do not transfer onshore monopile checks directly.
Cost & estimating
Not located in cited sourcesA project-specific estimate, bid schedule or final account was not found in the reviewed sources.
Schedule & construction
Partial recordThe operator records commissioning in 2017. The 2022 decommissioning document is a programme, not evidence that removal has occurred.
Completion & performance
Partial recordThe published field study reports subsea observations from 2018 and 2020. These observations show asset inspection opportunities and are not a complete geotechnical acceptance certificate.
Engineering methods
Suggested teaching exercise
Capstone project brief
Prepare a suction-anchor concept and inspection strategy for one mooring line, including cyclic demand and removal feasibility.
Starting information & inputs
- Trace the three-point mooring arrangement and identify the anchor information actually supplied by the project.
- Develop explicit study soil profiles and load envelopes when borehole/CPT data or proprietary design loads are unavailable.
Suggested deliverables
- Compare installation suction, holding capacity and cyclic degradation scenarios, retaining the distinction between drained and undrained assumptions.
- Prepare an ROV inspection plan, cable/mooring interaction review and a decommissioning sequence with geotechnical risks.
- A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.
- A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points.
Design questions
- Why can an anchor meet a monotonic holding-capacity check yet remain unsuitable under repeated inclined mooring loads?
- How would the preferred removal method change if the as-installed suction anchor has tilted or developed significant internal soil plugging?
Sources & original records
Equinor
public-link · Publisher-hosted; redistribution permission not established · Checked 2026-11-22Karlsson et al. / Wind Energy Science
public-link · Publisher-hosted; redistribution permission not established · Checked 2026-11-22Mike Pennington · 2022
Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.
public-link · CC BY-SA 2.0 · Checked 2026-11-22