Woodrow Wilson Bridge — foundation selection and testing
Technical project papers describe foundation alternatives and the new bridge foundations, including seismic soil–structure interaction and scour considerations.
Foundation Design · Cases
Documented projects, design decisions and lessons for engineering practice and capstone studies.
20 of 117 project case studies
Technical project papers describe foundation alternatives and the new bridge foundations, including seismic soil–structure interaction and scour considerations.
This design-build highway case documents drilled-shaft assessment using crosshole sonic logging and pile-integrity tests, including construction anomalies.
Four bridge retrofits used hollow-core bar micropiles under limited headroom after deterioration of exposed precast piles. The submitted case includes proof and verification tests.
A moving highway slope was stabilized using three reticulated micropile walls and ground anchors, allowing work under restricted access while maintaining traffic.
The navigation replacement became operational in 2018 after a long construction programme. USACE publishes project-control updates and completion material.
The five-turbine offshore project has public foundation-installation observations and subsequent structural-monitoring studies.
After a rainfall-triggered slide, ALDOT selected two bridges across the unstable area rather than reconstructing the road on the moving embankment.
Flood damage and channel migration prompted comparison of replacement spans and erosion protection at the County Road 91 crossing.
The tower uses a piled raft in weak sedimentary rock. The foundation designer publishes an analysis process linking ground characterization, trial pile testing and settlement predictions for super-tall towers.
Published studies of the tower foundation examine excavation heave, reloading and pile–raft interaction. They offer a useful comparison between simplified foundation springs and coupled settlement analyses.
The integrated resort was constructed on reclaimed waterfront land. The foundation contractors describe bored piling and advance removal of a buried seawall within a tightly constrained site.
Very tall bridge piers transfer load through large shaft-and-raft foundations in limestone and marl. The geotechnical authors report measured foundation movement and the observational design strategy.
The original airport terminal crosses former island rock and newly reclaimed ground. The designer describes a range of foundation types adapted to these contrasting conditions; a contemporaneous paper documents vibrocompaction of marine sand fill.
The remedial designer describes transferring part of the building load to new perimeter piles founded in rock. Installation-induced movement required changes to both pile construction and the final pile arrangement.
The barrier combines a long pile-supported wall with navigation gates and levee connections. The geotechnical consultant describes capacity, settlement, global stability and temporary-works analyses in soft coastal deposits.
The gate and pumping complex is founded in soft, compressible deltaic deposits. USACE authors describe exploration, laboratory characterization and pile testing used to develop design strength profiles.
The pipeline uses elevated supports where thaw-sensitive permafrost would be disturbed by warm oil. Operator and state-geology sources describe thermal support members, heat-pipe monitoring and maintenance.
Modernization studies used offshore investigation and a test-pile programme to examine drivability, capacity and underwater noise. The petroleum/cement terminal team also characterized cyclic behavior and soil–structure interaction.
The capacity upgrade required new tunnels beside operating infrastructure and existing building piles. The designer describes staged building-impact assessment and a load-transfer solution that retained foundation reuse options.
The main pylons use large groups of long drilled shafts in deep water and soft ground. Project papers connect testing, pile-group analysis, post-grouting, cofferdam construction and permanent scour protection.
| Title | Type | Owner / location | Year | Access |
|---|---|---|---|---|
| Woodrow Wilson Bridge — foundation selection and testing | Design and construction | Virginia DOT / Maryland State Highway AdministrationPotomac River, Virginia–Maryland | 2008 | Study materials |
| Virginia Route 288 — drilled-shaft quality evaluation | Construction quality and testing | Virginia Department of TransportationRichmond region, Virginia | 2004 | Study materials |
| New Jersey Turnpike bridges — micropile underpinning | Rehabilitation | New Jersey highway agencies; see sourceNew Jersey | 2008 | Study materials |
| US 26/89, Snake River Canyon — micropile slope stabilization | Rehabilitation | Wyoming Department of TransportationWyoming | 1997 | Study materials |
| Olmsted Locks and Dam — marine construction and project controls | Design and construction | US Army Corps of EngineersOhio River, Illinois–Kentucky | 2018 | Study materials |
| Block Island Wind Farm — pile foundations and measured stiffness | Design and construction | Deepwater Wind / project partnersOffshore Rhode Island | 2016 | Study materials |
| US 231, Lacey Springs — bridging a moving landslide | Rehabilitation | Alabama Department of TransportationLacey Springs, Alabama | 2020 | Original documents |
| Beaver Dam Wash Bridge — scour-resistant replacement | Rehabilitation | Mohave County Public WorksMohave County, Arizona | 2005 | Original documents |
| Burj Khalifa — piled-raft settlement design | Design, construction and performance | Emaar PropertiesDubai | 2010 | Study materials |
| Shanghai Tower — excavation compensation and pile–raft interaction | Design, construction and performance | Shanghai Tower Construction and DevelopmentShanghai | 2015 | Study materials |
| Marina Bay Sands — deep foundations on reclaimed ground | Design, construction and performance | Marina Bay SandsMarina Bay, Singapore | 2010 | Study materials |
| Millau Viaduct — rock foundations and observational control | Design, construction and performance | Compagnie Eiffage du Viaduc de MillauTarn Valley | 2004 | Study materials |
| Hong Kong International Airport — foundations across rock and reclamation | Design, construction and performance | Airport Authority Hong KongChek Lap Kok | 1998 | Study materials |
| Millennium Tower — perimeter-pile underpinning and monitored load transfer | Design, construction and performance | Millennium Tower Homeowners AssociationSan Francisco | 2023 | Study materials |
| Lake Borgne surge barrier — pile-supported flood protection | Design, construction and performance | Flood Protection Authority East / USACENew Orleans, Louisiana | 2013 | Study materials |
| West Closure Complex — foundations on soft deltaic deposits | Design, construction and performance | US Army Corps of EngineersNew Orleans, Louisiana | 2011 | Study materials |
| Trans-Alaska Pipeline — thermally stabilized supports in permafrost | Design, construction and performance | Alyeska Pipeline Service CompanyAlaska | 2022 | Study materials |
| Port of Alaska — test piles and seismic waterfront foundations | Design, construction and performance | Don Young Port of AlaskaAnchorage, Alaska | 2020 | Study materials |
| Bank station upgrade — tunnelling through existing pile zones | Design, construction and performance | London UndergroundCity of London | 2023 | Study materials |
| Sutong Bridge — deep pile groups and riverbed scour protection | Design, construction and performance | Sutong Bridge project authoritiesYangtze River, Jiangsu | 2008 | Study materials |
Each case separates documented project decisions and available records from a suggested capstone exercise. Missing final designs, costs, schedules or completion records are identified. A teaching exercise may require additional assumptions, site investigation or instructor-supplied inputs.
Projects may address several topics. Counts below represent relevant project records, not independent examples for every method.