Woodrow Wilson Bridge — foundation selection and testing
Technical project papers describe foundation alternatives and the new bridge foundations, including seismic soil–structure interaction and scour considerations.
Foundation Design · Cases
Documented projects, design decisions and lessons for engineering practice and capstone studies.
11 of 117 project case studies
Technical project papers describe foundation alternatives and the new bridge foundations, including seismic soil–structure interaction and scour considerations.
Four bridge retrofits used hollow-core bar micropiles under limited headroom after deterioration of exposed precast piles. The submitted case includes proof and verification tests.
Recovery rebuilt the main spillway and added a secant pile wall, splashpad and buttress at the emergency spillway after the 2017 incident.
After the 2020 fire, CDOT compared rockfall mitigation using risk and benefit-cost analysis. Subsequent debris flows exceeded some installed protection capacities.
The NTSB investigation documents the bridge collapse after scour undermined spread-footing support, including construction, protection and inspection issues.
Flood damage and channel migration prompted comparison of replacement spans and erosion protection at the County Road 91 crossing.
Following Hurricane Michael, roadway reconstruction incorporated articulated concrete blocks over filter fabric and bedding to reduce recurring embankment erosion.
After the 2019 flood damaged the road embankment, Iowa DOT selected anchored concrete-block matting and evaluated recurring-damage economics.
The safety programme combines anchoring, drainage and armor over the bedrock stilling basin. Construction must be staged while the spillway remains an active river-release route.
The main pylons use large groups of long drilled shafts in deep water and soft ground. Project papers connect testing, pile-group analysis, post-grouting, cofferdam construction and permanent scour protection.
The movable barrier retains tidal exchange while closing during severe water levels. Its foundation and bed-protection concepts provide a case on erosion resistance, interface stability and long-term renewal of marine structures.
| Title | Type | Owner / location | Year | Access |
|---|---|---|---|---|
| Woodrow Wilson Bridge — foundation selection and testing | Design and construction | Virginia DOT / Maryland State Highway AdministrationPotomac River, Virginia–Maryland | 2008 | Study materials |
| New Jersey Turnpike bridges — micropile underpinning | Rehabilitation | New Jersey highway agencies; see sourceNew Jersey | 2008 | Study materials |
| Oroville spillway recovery — erosion-resistant foundation reconstruction | Rehabilitation | California Department of Water ResourcesOroville, California | 2018 | Study materials |
| I-70 Grizzly Creek — post-fire rockfall risk and betterment | Rehabilitation | Colorado Department of TransportationGlenwood Canyon, Colorado | 2021 | Original documents |
| Schoharie Creek Bridge — scour and foundation inspection | Forensic investigation | New York State Thruway AuthorityNear Amsterdam, New York | 1987 | Original documents |
| Beaver Dam Wash Bridge — scour-resistant replacement | Rehabilitation | Mohave County Public WorksMohave County, Arizona | 2005 | Original documents |
| US 98, Florida — coastal roadway revetment | Rehabilitation | Florida Department of TransportationFlorida Panhandle | 2018 | Original documents |
| US 34, Iowa — flood-resistant embankment matting | Rehabilitation | Iowa Department of TransportationMills County, Iowa | 2021 | Original documents |
| Bluestone Dam — rock anchors and spillway-foundation protection | Design, construction and performance | US Army Corps of EngineersHinton, West Virginia | 2026 | Study materials |
| Sutong Bridge — deep pile groups and riverbed scour protection | Design, construction and performance | Sutong Bridge project authoritiesYangtze River, Jiangsu | 2008 | Study materials |
| Eastern Scheldt Barrier — foundation mats and scour resilience | Design, construction and performance | RijkswaterstaatZeeland | 1986 | Study materials |
Each case separates documented project decisions and available records from a suggested capstone exercise. Missing final designs, costs, schedules or completion records are identified. A teaching exercise may require additional assumptions, site investigation or instructor-supplied inputs.
Projects may address several topics. Counts below represent relevant project records, not independent examples for every method.