The main pylons use large groups of long drilled shafts in deep water and soft ground. Project papers connect testing, pile-group analysis, post-grouting, cofferdam construction and permanent scour protection.
Project evidence
Design & engineering
Partial recordThe foundation papers describe 131 shafts beneath each main pylon, project-specific test/model evidence and construction methods. Published pile dimensions and group coefficients apply to the stated foundation and cannot be adopted as universal design factors.
Cost & estimating
Not located in cited sourcesA project-specific estimate, bid schedule or final account was not found in the reviewed sources.
Schedule & construction
Not located in cited sourcesA dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.
Completion & performance
Partial recordThe source papers include pile testing, model studies and field-monitoring comparisons, while a complete current inspection and as-built record set was not established.
Engineering methods
Published quantities & cost references
These values retain the scope and date basis of their cited source. Estimates, alternatives and partial packages are identified individually.
| Item | Reported value | Scope & source |
|---|---|---|
| Bored piles per main pylon foundation | 131 piles | Large main-pylon group described in the DFI foundation paper; not the whole-bridge pile total.As reported by the cited project source; not a universal design input.Source s1 · Foundation arrangement |
| Reported pile length — shorter group | 114 m | One of the two reported main-pylon pile lengths; verify group location in the source before modelling.As reported by the cited project source; not a universal design input.Source s1 · Foundation arrangement |
| Reported pile length — longer group | 117 m | Other reported main-pylon pile length; not an uncertainty range for every pile.As reported by the cited project source; not a universal design input.Source s1 · Foundation arrangement |
Suggested teaching exercise
Capstone project brief
Develop a coupled foundation-and-scour assessment for one Sutong main pylon, preserving the distinction between individual-pile testing and group response.
Starting information & inputs
- Select the north or south foundation and retain its own shaft geometry, stratigraphy, load tests and pile-cap configuration.
- Extract the design scour/protection assumptions and identify temporary construction conditions separately from permanent conditions.
Suggested deliverables
- Compare single-shaft and group axial/lateral response using transparent assumptions and documented calibration evidence.
- Prepare a scour-monitoring and protection-maintenance concept with a construction-stage cofferdam risk register.
- A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.
- A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points.
Design questions
- Why would a tip post-grouting result on a single shaft not directly establish the settlement of the full pylon pile group?
- How could local bed erosion change lateral foundation response even before the calculated axial resistance becomes critical?
Sources & original records
Yang, Dai and Gong / Missouri S&T
public-link · Publisher-hosted; redistribution permission not established · Checked 2026-11-22Project authors / Strategic Study of CAE
public-link · Publisher-hosted; redistribution permission not established · Checked 2026-11-22Trevor and Joce · 2007
Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.
public-link · CC BY-SA 2.0 · Checked 2026-11-22