Foundation Design · Cases

Find Engineering Cases

Documented projects, design decisions and lessons for engineering practice and capstone studies.

Owner, location & access
Clear filters

35 of 117 project case studies

The 100 South utility corridor during the Salt Lake City I-15 reconstruction, shown in the project authors’ Figure 2.

Utah Department of Transportation · 2001

I-15 reconstruction — soft-ground embankments and geofoam

Rapid highway reconstruction over soft lacustrine soils used geofoam, lime-cement columns, vertical drains, surcharge and staged MSE construction. UDOT reports ten-year performance.

Settlement and consolidationGround improvementReinforced soil and geosynthetics
Vertical-drain construction on the US 14 embankment project near Nicollet, Minnesota.

Minnesota Department of Transportation · 2016

US 14 near Nicollet — preload and vertical drains

A highway embankment over organic clay used vertical drains, surcharge and staged filling, with remote monitoring of pore pressure and settlement.

Settlement and consolidationGround improvementExpansive, collapsible and organic soils
Concrete barrier-wall construction in the Wolf Creek Dam embankment on May 2, 2012.

US Army Corps of Engineers · 2013

Wolf Creek Dam — karst-foundation cutoff wall

A deep concrete barrier and associated grouting addressed seepage through the dam’s karst foundation. USACE documents completion and project scope.

Dams and leveesSeepage and internal erosionRock slopes and foundations
Aerial photograph of liquefaction at QEII Park and its surroundings on 11 March 2011. This records the site context before the later ground-improvement trials, not the trial construction.

New Zealand building ministry and trial partners · 2012

Canterbury residential ground-improvement trials

The 2012 trials compared shallow rafts, mixing columns, a perimeter curtain and densification approaches to support residential foundation repair and rebuilding.

Ground improvementEarthquakes and liquefactionShallow foundations
Satellite view of Kansai International Airport and its reclaimed offshore island works.

Kansai Airports · 2025

Kansai International Airport — reclamation and long-term settlement

An offshore airport on deep marine deposits combines accelerated consolidation with ongoing settlement observation and adjustable building supports. The operator publishes measured island subsidence and its mitigation approach.

Settlement and consolidationGround improvementExpansive, collapsible and organic soils
Historical aerial photograph of the enclosed Changi East slurry pond before reclamation.

Singapore reclamation authorities · 2005

Changi East reclamation — instrumented vertical-drain design

The reclamation programme used prefabricated vertical drains to accelerate consolidation of marine clay. Its investigators publish pilot trials, specialized testing and interpretation of settlement and pore-pressure records.

Settlement and consolidationGround improvementLaboratory testing and parameters
Aerial view of the Port of Brisbane and adjoining airport in 2015.

Port of Brisbane · 2009

Port of Brisbane — vacuum consolidation beside a marine park

A reclamation trial combined vacuum preloading and vertical drainage in soft dredged mud and underlying clay. A cutoff isolated permeable layers, while stability at the adjacent marine park constrained surcharge filling.

Ground improvementSettlement and consolidationSeepage and internal erosion
Palm Jumeirah viewed from a helicopter in May 2008.

Nakheel · 2006

Palm Jumeirah — densification of reclaimed sand

The artificial island’s reclaimed sand was treated by vibrocompaction before infrastructure construction. The project’s visitor centre explains the working sequence and its role in controlling settlement and liquefaction susceptibility.

Ground improvementCoastal and offshore foundationsEarthquakes and liquefaction
Salesforce Tower during construction in San Francisco.

Salesforce Tower development team · 2018

Salesforce Tower — staged excavation and artesian-pressure control

The excavation engineer describes a staged support system using deep soil-mixed soldier walls, internal bracing, jet-grouted shafts, a secant-pile ring and tiebacks. Artesian pressure and nearby structures governed key design checks.

Excavation supportDewatering and groundwaterGround improvement
East Branch Clarion River Lake and Dam near Wilcox, Pennsylvania.

US Army Corps of Engineers · 2020

East Branch Dam — cutoff-wall construction and verification

A dam-repair programme installed a cutoff wall to reduce foundation seepage. USACE reports the contract and return toward normal operations; the technical literature discusses wall verification drilling.

Dams and leveesSeepage and internal erosionGround improvement

From project evidence to a design study

Each case separates documented project decisions and available records from a suggested capstone exercise. Missing final designs, costs, schedules or completion records are identified. A teaching exercise may require additional assumptions, site investigation or instructor-supplied inputs.

Topic coverage

Projects may address several topics. Counts below represent relevant project records, not independent examples for every method.