Cases / Project case study

Tempe Marketplace — foundations over former landfill

The submitted case describes dynamic compaction of variable former landfill material before shallow foundations and slabs were constructed.

Ground improvementShallow foundationsContaminated ground and waste barriersMonitoring and observational design
Tempe Marketplace after construction, April 2008.
Tempe Marketplace after construction, April 2008. This is the completed development on the remediated landfill site, not a photograph of the ground-improvement work.Cygnusloop99 · Image source · CC BY-SA 3.0

Project evidence

Design & engineering

Partial record

The case gives separate treatment passes for general areas and building zones and describes plate-load verification.

Sources: s1

Cost & estimating

Partial record

Reported compaction rates were approximately $1.00/ft² for initial passes plus $1.25/ft² for additional building passes; supporting earthwork is excluded.

Sources: s1

Schedule & construction

Not located in cited sources

A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.

Completion & performance

Partial record

Plate-load and vibration monitoring are described; raw test datasets are not supplied.

Sources: s1

Engineering methods

Dynamic compactionShallow foundationsVibration control

Suggested teaching exercise

Capstone project brief

Develop a redevelopment foundation strategy that addresses both geotechnical settlement and environmental constraints of former landfill ground.

Starting information & inputs

  • Extract the source’s treatment energy, grid and verification approach.
  • Identify gas, contamination and decomposable-waste data absent from the geotechnical summary.

Suggested deliverables

  • Compare foundations on treated ground with an alternative deep-foundation option.
  • Prepare a trial-pad programme, vibration limits and residual-settlement allowances.
  • A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.
  • A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points.

Design questions

  • Which site data control the decision, and what additional investigation would reduce uncertainty?
  • How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?

The brief is a proposed educational exercise based on the cited project, not the original designer's instruction or a complete construction document set.

Sources & original records

Tempe Marketplace, Tempe, AZ ↗

ASCE Geo-Institute / named case-history author · 2023

Case author Chris Woods; technical paper Woods, Shaffer and Drumheller (2023). The source’s 2015 case date is retained without equating it with opening of the entire retail centre.