ASCE Geo-Institute / named case-history author · 2023
Case author Chris Woods; technical paper by Woods et al., 2023 DFI conference.
public-link · Publisher-hosted; redistribution permission not established · Checked 2026-11-22A distribution-centre site on former strip-mine ground combined dynamic compaction with aggregate piers where wet, weak areas did not respond adequately.
The project engineer’s case describes the change in treatment, post-improvement SPT checks and aggregate-pier modulus tests.
The source reports about $950,000 for dynamic compaction only; earthwork and aggregate-pier costs are unavailable.
The documented project period is 2021–2022.
The case includes post-improvement SPT and pier-modulus verification.
These values retain the scope and date basis of their cited source. Estimates, alternatives and partial packages are identified individually.
| Item | Reported value | Scope & source |
|---|---|---|
| Dynamic-compaction package | 950,000 USD | Approximate dynamic-compaction cost; earthworks and aggregate columns excluded.As reported; no escalation or inflation adjustment.Source s1 · Cost Information |
Suggested teaching exercise
Prepare a ground-improvement design with an explicit decision rule for changing treatment in saturated or poorly responding zones.
ASCE Geo-Institute / named case-history author · 2023
Case author Chris Woods; technical paper by Woods et al., 2023 DFI conference.
public-link · Publisher-hosted; redistribution permission not established · Checked 2026-11-22