Cases / Project case study

Olyphant distribution centre — variable mine-spoil improvement

A distribution-centre site on former strip-mine ground combined dynamic compaction with aggregate piers where wet, weak areas did not respond adequately.

Ground improvementShallow foundationsExpansive, collapsible and organic soilsEarthworks and pavement subgrades
The Olyphant, Pennsylvania distribution-centre site during its mine-spoil ground-improvement programme.
The Olyphant, Pennsylvania distribution-centre site during its mine-spoil ground-improvement programme.Densification, Inc.; published by ASCE Geo-Institute · Image source · No open reuse license verified; original copyright retained

Project evidence

Design & engineering

Partial record

The project engineer’s case describes the change in treatment, post-improvement SPT checks and aggregate-pier modulus tests.

Sources: s1

Cost & estimating

Partial record

The source reports about $950,000 for dynamic compaction only; earthwork and aggregate-pier costs are unavailable.

Sources: s1

Schedule & construction

Partial record

The documented project period is 2021–2022.

Sources: s1

Completion & performance

Partial record

The case includes post-improvement SPT and pier-modulus verification.

Sources: s1

Engineering methods

Dynamic compactionAggregate piersPerformance verification

Published quantities & cost references

These values retain the scope and date basis of their cited source. Estimates, alternatives and partial packages are identified individually.

Source-backed project quantities and costs
ItemReported valueScope & source
Dynamic-compaction package950,000 USDApproximate dynamic-compaction cost; earthworks and aggregate columns excluded.As reported; no escalation or inflation adjustment.Source s1 · Cost Information

Suggested teaching exercise

Capstone project brief

Prepare a ground-improvement design with an explicit decision rule for changing treatment in saturated or poorly responding zones.

Starting information & inputs

  • Extract fill depths, initial/post-treatment tests and observed crater response.
  • Separate warehouse foundation requirements from yard pavement requirements.

Suggested deliverables

  • Develop treatment zoning and a field trial with measurable acceptance criteria.
  • Compare additional compaction, aggregate piers and excavation/replacement.
  • A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.
  • A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points.

Design questions

  • Which site data control the decision, and what additional investigation would reduce uncertainty?
  • How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?

The brief is a proposed educational exercise based on the cited project, not the original designer's instruction or a complete construction document set.

Sources & original records

Distribution Center Site, Olyphant, PA ↗

ASCE Geo-Institute / named case-history author · 2023

Case author Chris Woods; technical paper by Woods et al., 2023 DFI conference.

public-link · Publisher-hosted; redistribution permission not established · Checked 2026-11-22