FHWA / FDOT · 2023
public-link · US federal agency case study; original credits retained · Checked 2026-11-22US 98, Florida — coastal roadway revetment
Following Hurricane Michael, roadway reconstruction incorporated articulated concrete blocks over filter fabric and bedding to reduce recurring embankment erosion.
Project evidence
Design & engineering
DocumentedThe FHWA case includes an as-built shoulder section, construction details and comparison with retaining-wall protection.
Cost & estimating
Partial recordThe source reports $5.25 million for resilience improvements and a separate 1,000-ft comparison: $490,000 protection versus $724,000 reconstruction.
Schedule & construction
Partial recordThe study concerns recovery after the October 2018 hurricane; it also compares performance of protection installed after an earlier storm.
Completion & performance
Partial recordAn as-built shoulder detail and observed performance comparisons appear in the source.
Engineering methods
Published quantities & cost references
These values retain the scope and date basis of their cited source. Estimates, alternatives and partial packages are identified individually.
| Item | Reported value | Scope & source |
|---|---|---|
| Resilience-improvement cost | 5,250,000 USD | Reported project resilience improvements.As reported; no escalation or inflation adjustment.Source s1 · Project Snapshot |
| Protection comparison cost | 490,000 USD per 1,000 ft | Articulated-concrete-block protection in the stated comparison.As reported; no escalation or inflation adjustment.Source s1 · Page 2, cost comparison |
| Reconstruction comparison cost | 724,000 USD per 1,000 ft | Road reconstruction without equivalent protection in the stated comparison.As reported; no escalation or inflation adjustment.Source s1 · Page 2, cost comparison |
Suggested teaching exercise
Capstone project brief
Design a roadway-embankment protection concept with particular attention to drains and interfaces where protection can be discontinuous.
Starting information & inputs
- Extract the published shoulder section and treatment layers.
- Establish wave/current demands and filtration requirements from appropriate site data.
Suggested deliverables
- Check filter compatibility, toe/interface stability and treatment limits.
- Reproduce the stated cost comparison and test sensitivity to storm recurrence and residual damage.
- A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.
- A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points.
Design questions
- Which site data control the decision, and what additional investigation would reduce uncertainty?
- How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?