Cases / Project case study

US 98, Florida — coastal roadway revetment

Following Hurricane Michael, roadway reconstruction incorporated articulated concrete blocks over filter fabric and bedding to reduce recurring embankment erosion.

Scour and erosion protectionCoastal and offshore foundationsReinforced soil and geosyntheticsEarthworks and pavement subgradesEstimating, sequencing and project delivery
The articulating concrete-block revetment beside US 98 in Florida, shown in Figure 3 of the FHWA case study.
The articulating concrete-block revetment beside US 98 in Florida, shown in Figure 3 of the FHWA case study.Federal Highway Administration (FHWA) · Image source · U.S. government photograph — credited to FHWA in the source

Project evidence

Design & engineering

Documented

The FHWA case includes an as-built shoulder section, construction details and comparison with retaining-wall protection.

Sources: s1

Cost & estimating

Partial record

The source reports $5.25 million for resilience improvements and a separate 1,000-ft comparison: $490,000 protection versus $724,000 reconstruction.

Sources: s1

Schedule & construction

Partial record

The study concerns recovery after the October 2018 hurricane; it also compares performance of protection installed after an earlier storm.

Sources: s1

Completion & performance

Partial record

An as-built shoulder detail and observed performance comparisons appear in the source.

Sources: s1

Engineering methods

Articulated concrete blocksFiltersCoastal erosion

Published quantities & cost references

These values retain the scope and date basis of their cited source. Estimates, alternatives and partial packages are identified individually.

Source-backed project quantities and costs
ItemReported valueScope & source
Resilience-improvement cost5,250,000 USDReported project resilience improvements.As reported; no escalation or inflation adjustment.Source s1 · Project Snapshot
Protection comparison cost490,000 USD per 1,000 ftArticulated-concrete-block protection in the stated comparison.As reported; no escalation or inflation adjustment.Source s1 · Page 2, cost comparison
Reconstruction comparison cost724,000 USD per 1,000 ftRoad reconstruction without equivalent protection in the stated comparison.As reported; no escalation or inflation adjustment.Source s1 · Page 2, cost comparison

Suggested teaching exercise

Capstone project brief

Design a roadway-embankment protection concept with particular attention to drains and interfaces where protection can be discontinuous.

Starting information & inputs

  • Extract the published shoulder section and treatment layers.
  • Establish wave/current demands and filtration requirements from appropriate site data.

Suggested deliverables

  • Check filter compatibility, toe/interface stability and treatment limits.
  • Reproduce the stated cost comparison and test sensitivity to storm recurrence and residual damage.
  • A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.
  • A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points.

Design questions

  • Which site data control the decision, and what additional investigation would reduce uncertainty?
  • How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?

The brief is a proposed educational exercise based on the cited project, not the original designer's instruction or a complete construction document set.

Sources & original records