Lee Tunnel — diaphragm-wall shafts in water-bearing chalk

Deep circular shafts and a slurry-driven tunnel connected Abbey Mills and Beckton. The foundation contractor describes diaphragm-wall design, fractured chalk and flint bands encountered during shaft construction.

Tunnels and underground worksExcavation supportDewatering and groundwaterRetaining walls and anchors
Construction photograph looking down into a circular Lee Tunnel diaphragm-wall shaft.
Looking into a deep Lee Tunnel diaphragm-wall shaft during construction, from the foundation contractor’s project gallery. The source does not identify this image as one particular named shaft.Bachy Soletanche · Image source · No open reuse license verified; original copyright retained

Project evidence

Design & engineering

Partial record

The contractor account describes geology and shaft systems; the contract case supplies delivery context. Its later Tideway forecasts are historical and are not treated as current milestones.

Sources: s1 · s2

Cost & estimating

Partial record

The contract case describes a £675 million overall project. It is not a shaft-only cost or an independently audited final account.

Sources: s1 · s2

Schedule & construction

Partial record

The contract case reports operation beginning in 2016 and overall completion in 2017.

Sources: s1 · s2

Completion & performance

Not located in cited sources

Complete as-built drawings and acceptance records were not found in the reviewed sources.

Engineering methods

Diaphragm-wall shaftsHoop actionCurtain groutingSlurry TBM

Suggested teaching exercise

Capstone project brief

Design a circular access shaft with large openings through mixed superficial deposits and chalk.

Starting information & inputs

  • Extract the reported shaft geometry range and rock description.
  • Identify openings and non-axisymmetric actions that violate a simple uniform hoop model.

Suggested deliverables

  • Check wall forces, basal water pressure and the staged excavation sequence.
  • Specify verticality, panel-joint and grouting acceptance checks before deep excavation.
  • A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.
  • A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points.

Design questions

  • How do large shaft openings alter the advantages of circular wall action?
  • Which checks become most sensitive when chalk fractures connect to overlying sands?

The brief is a proposed educational exercise based on the cited project, not the original designer's instruction or a complete construction document set.