Cases / Project case study

Berkeley Pit — mine flooding and hydraulic containment

The flooded open pit and connected underground mine workings require water-level management and treatment. Public monitoring records link hydraulic containment with an ongoing remediation operation.

Contaminated ground and waste barriersDewatering and groundwaterRock slopes and foundationsSeepage and internal erosionMonitoring and observational design
The Berkeley Pit in Butte, Montana, photographed in 2013. The image shows the actual flooded pit; water-level controls and treatment performance should be read from the dated monitoring records.
The Berkeley Pit in Butte, Montana, photographed in 2013. The image shows the actual flooded pit; water-level controls and treatment performance should be read from the dated monitoring records.Chris06 / Wikimedia Commons · Image source · CC BY-SA 4.0

Project evidence

Design & engineering

Partial record

EPA identifies the Butte Mine Flooding operable unit and continuing treatment. The official monitoring archive provides dated discharge reports; pit water, connected mine water and surrounding aquifers must be represented as a connected system.

Sources: s1 · s2 · s3

Cost & estimating

Not located in cited sources

A project-specific estimate, bid schedule or final account was not found in the reviewed sources.

Schedule & construction

Not located in cited sources

A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.

Completion & performance

Partial record

Public discharge reports and EPA status material document continuing treatment and monitoring. They are dated operational records, not evidence that treatment can be discontinued.

Sources: s1 · s2 · s3

Engineering methods

Mine-water balanceHydraulic containmentPumping and treatmentMonitoring interpretation

Suggested teaching exercise

Capstone project brief

Develop a water-balance and containment assessment for the flooded mine, with sensitivity to uncertain inflow and temporary treatment interruption.

Starting information & inputs

  • Use a dated monthly monitoring report for observed discharge and compliance data.
  • Identify pit and mine-water levels, the relevant control elevation and its datum, and unmeasured groundwater exchanges.

Suggested deliverables

  • Build a time-dependent storage/pumping model that distinguishes observations, calibrated flows and conservative assumptions.
  • Develop outage scenarios, monitoring triggers and a recovery pumping strategy with treatment-capacity constraints.
  • A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.
  • A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points.

Design questions

  • How would a stable pit level conceal a change in groundwater capture or treatment demand?
  • What evidence is needed before comparing a reported control elevation with survey data recorded in a different vertical datum?

The brief is a proposed educational exercise based on the cited project, not the original designer's instruction or a complete construction document set.

Sources & original records

2013 Berkeley Pit, Butte, Montana (1).jpg ↗

Chris06 · 2013

Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.

public-link · CC BY-SA 4.0 · Checked 2026-11-22