Docs / HEC-18 / FHWA-HIF-12-003

Published first page of FHWA HEC-18 — Evaluating scour at bridges

FHWA HEC-18 — Evaluating scour at bridges

Evaluate scour at bridge foundations and connect geotechnical conditions with design, inspection and plans of action.

Piles, shafts and anchorsShallow foundationsSeepage, groundwater and drainageRisk, reporting and project deliveryInstrumentation and monitoring

Scope & use

Download PDF

340 pages · 7.0 MB · Original published document

Addresses contraction, pier and abutment scour, pressure-flow effects and scour in cohesive soils and erodible rock. Includes bridge inspection and risk-based evaluation considerations. Read with the companion stream-stability and scour-countermeasure guidance and any current FHWA or state amendments; this file is explicitly the 2012 fifth edition.

Edition and application

Published technical reference; confirm the applicable jurisdiction, project requirements and later revisions.

Sources & original records

FHWA HEC-18 — Evaluating scour at bridges ↗

Federal Highway Administration · 2012

official-free · U.S. Government / FHWA technical publication; original public-release document with embedded attribution and third-party notices retained. · Checked 2026-11-22