FHWA Geotechnical Engineering Circular 15 (GEC 15) develops acceptance procedures for driven piles, drilled shafts, micropiles and continuous-flight-auger piles. Relates project performance requirements to construction observations, testing and documentation. Use the acceptance plan with the governing design specification and project-specific contract requirements. The document expressly excludes shallow foundations.

Edition and application

Published reference; confirm the governing contract, jurisdiction and applicable revisions.