FHWA · 2022
official-free · U.S. Government / FHWA publication. Its report-documentation page permits unrestricted distribution; retain all publisher and third-party credits. · Checked 2026-11-22FHWA — Acceptance of structural foundations
Develop foundation acceptance procedures that connect design assumptions to construction evidence.
Scope & use
Download PDF
127 pages · 4.6 MB · Original published document
FHWA Geotechnical Engineering Circular 15 (GEC 15) develops acceptance procedures for driven piles, drilled shafts, micropiles and continuous-flight-auger piles. Relates project performance requirements to construction observations, testing and documentation. Use the acceptance plan with the governing design specification and project-specific contract requirements. The document expressly excludes shallow foundations.
Edition and application
Published reference; confirm the governing contract, jurisdiction and applicable revisions.
Sources & original records
FHWA
official-free · Official public access; separate redistribution permission not established. · Checked 2026-11-22