Docs / DS 13, Chapter 16

Published first page of USBR DS 13, Chapter 16 — Cutoff Walls

USBR DS 13, Chapter 16 — Cutoff Walls

Select and design cutoff walls as part of an integrated seepage-control system.

Dams and leveesSeepage, groundwater and drainageConstruction, inspection and acceptance

Scope & use

Download PDF

122 pages · 4.5 MB · Original published document

Select and design cutoff walls as part of an integrated seepage-control system. Published as a separate chapter within Design Standards No. 13, Embankment Dams.

Edition and application

Published reference; confirm the governing contract, jurisdiction and applicable revisions.

Sources & original records

USBR DS 13, Chapter 16 — Cutoff Walls ↗

Bureau of Reclamation · 2014

Chapter and date verified in Reclamation’s Design Standards table; original government publication retained without modification.

official-free · U.S. Government work; original published document with embedded third-party credits retained. · Checked 2026-11-22