Driven pile shaft resistance — beta method

Deep Foundation, Drive Piles-Bearing Capacity

By Foundation Design Example Library

359 Rank #27 Views 3,978
Workspace
QUICK ACCESS
Related engineering apps Cases & data

App-specific engineering geometry and parameter schematic

Theory and Method

\documentclass[11pt]{article} \usepackage{amsmath,amssymb,longtable,hyperref} \begin{document} \section{Driven pile shaft resistance -- beta method} \subsection{Application and idealization} Effective stress pile shaft friction with mean stress estimate. \subsection{Governing equations} $Q_s=\beta\bar\sigma_v^{\prime}\pi DL$. \subsection{Inputs, symbols and units} \begin{longtable}{p{0.16\linewidth}p{0.42\linewidth}p{0.12\linewidth}p{0.18\linewidth}} Symbol & Meaning & Unit & Default \\ D & Pile or shaft diameter (m) & m & 0.45 \\ L & Embedded length (m) & m & 16 \\ beta & Effective-stress beta factor (-) & - & 0.3 \\ sigavg & Mean effective vertical stress (kPa) & kPa & 110 \\ \end{longtable} \subsection{Calculation procedure} Substitute the input values into the governing output equation. \begin{itemize} \item Ultimate shaft resistance: \( \beta\,\mathrm{sigavg}\,\pi\,D\,L \). \end{itemize} \subsection{Worked example using default inputs} \begin{itemize} \item Ultimate shaft resistance: 746.44241 kN. \end{itemize} \subsection{Assumptions and interpretation} Requires calibrated beta and appropriate soil stratification; no negative skin friction. \subsection{Accepted input ranges} \begin{itemize} \item Pile or shaft diameter (m): 0.1 to 5 m. \item Embedded length (m): 0.5 to 150 m. \item Effective-stress beta factor (-): 0.01 to 3 -. \item Mean effective vertical stress (kPa): 1 to 1000000 kPa. \end{itemize} \subsection{Reference and scope} FHWA NHI-10-016, Drilled Shafts: Construction Procedures and LRFD Design Methods (2010). \url{https://rosap.ntl.bts.gov/view/dot/40746} Axial side-resistance concepts; the component calculation uses a user-selected average adhesion or interface strength. \end{document}

Engineering Calculator

Engineering Calculation Results