Pile-group efficiency — Converse–Labarre

Deep Foundation, Drive Piles-Settlement

By Foundation Design Example Library

310 Rank #52 Views 7,489
Workspace
QUICK ACCESS
Related engineering apps Cases & data

App-specific engineering geometry and parameter schematic

Theory and Method

\documentclass[11pt]{article} \usepackage{amsmath,amssymb,longtable,hyperref} \begin{document} \section{Pile-group efficiency -- Converse--Labarre} \subsection{Application and idealization} Empirical Converse--Labarre group efficiency estimate. \subsection{Governing equations} $\eta=1-\theta[(m-1)n+(n-1)m]/(90mn)$ with $\theta=\arctan(D/s)$ in degrees. \subsection{Inputs, symbols and units} \begin{longtable}{p{0.16\linewidth}p{0.42\linewidth}p{0.12\linewidth}p{0.18\linewidth}} Symbol & Meaning & Unit & Default \\ m & Pile rows (count) & - & 3 \\ n & Piles per row (count) & - & 3 \\ D & Pile or shaft diameter (m) & m & 0.45 \\ spacing & Pile center spacing (m) & m & 1.35 \\ \end{longtable} \subsection{Calculation procedure} \[ \theta = \frac{\operatorname{atan}\left(\frac{D}{\mathrm{spacing}}\right)\,180}{\pi} \] \[ \mathrm{eff} = 1-\frac{\theta\,\left(\left(m-1\right)\,n+\left(n-1\right)\,m\right)}{90\,m\,n} \] \begin{itemize} \item Empirical group efficiency: \( \mathrm{eff} \). \item Number of piles: \( m\,n \). \end{itemize} \subsection{Worked example using default inputs} \begin{itemize} \item Empirical group efficiency: 0.72688965. \item Number of piles: 9. \end{itemize} \subsection{Assumptions and interpretation} Not universal for rock, friction piles, cohesive block failure, settlement, or close spacing. \subsection{Accepted input ranges} \begin{itemize} \item Pile rows (count): 1 to 100 -. \item Piles per row (count): 1 to 100 -. \item Pile or shaft diameter (m): 0.1 to 5 m. \item Pile center spacing (m): 0.1 to 100 m. \end{itemize} \subsection{Reference and scope} FHWA NHI-06-089, Soils and Foundations Reference Manual, Volume II (2006). \url{https://rosap.ntl.bts.gov/view/dot/53656} Foundation and retaining-system background. Project-specific factors and complete design checks remain separate. \end{document}

Engineering Calculator

Engineering Calculation Results