Dynamic compaction — calibrated influence depth

Soil Improvement, Deep Compaction

By Foundation Design Method Library

222 Rank #96 Views 2,895
Workspace
QUICK ACCESS
Related engineering apps Cases & data

App-specific engineering geometry and parameter schematic

Theory and Method

\documentclass[11pt]{article} \usepackage{amsmath,amssymb,geometry,xurl,hyperref} \geometry{margin=0.85in} \setlength{\emergencystretch}{3em} \begin{document} \section{Dynamic compaction - calibrated influence depth} \subsection{Purpose} Use the FHWA empirical depth relation to compare a tamper and drop-height combination with a target improvement depth. The equation uses metric tonnes for mass and metres for height; the coefficient is unit-dependent. \subsection{Method and governing equations} \[ D=n\sqrt{MH},\qquad E=9.81MH,\qquad H_{\mathrm{target}}=\frac{(D_{\mathrm{target}}/n)^2}{M} \] \subsection{Inputs, symbols and units} \begin{itemize} \item \textbf{Tamper mass} ($\mathtt{M}$): tonne. Default 20. \item \textbf{Drop height} ($\mathtt{H}$): m. Default 20. \item \textbf{Calibrated depth coefficient n} ($\mathtt{n}$): -. Default 0.5. \item \textbf{Target influence depth} ($\mathtt{Dtarget}$): m. Default 10. \end{itemize} \subsection{Interpreting the results} Use trial-area measurements to select n and then inspect the sensitivity to mass and height. Plan production energy, construction stages and verification separately. \subsection{Worked default example} \begin{itemize} \item Estimated influence depth: 10 m. \item Potential energy per drop: 3924 kJ. \item Drop height implied by target depth: 20 m. \end{itemize} \subsection{Verification example} The stored benchmark is an independently evaluated identity or worked numerical case, not a value copied from the runtime output. The verification case uses the default inputs listed above. Expected benchmark quantities: \begin{itemize} \item Estimated influence depth: 10. \item Potential energy per drop: 3924. \item Drop height implied by target depth: 20. \end{itemize} \subsection{Assumptions and limits} The coefficient range 0.3 to 0.8 follows the broad FHWA trend and still requires site calibration. Influence depth is not a prediction of achieved density, liquefaction resistance or uniform improvement. Weak energy-absorbing layers, groundwater, spacing, number of drops, rest periods and adjacent-structure vibration can control feasibility. An implied drop height is a mathematical planning quantity and may exceed practical equipment limits. \subsection{References} FHWA GEC 13, Ground Modification Methods Reference Manual, Volume I (2016). FHWA GEC 13 Volume I, deep dynamic compaction, equation 4-1 and Figure 4-21.. \url{https://highways.dot.gov/sites/fhwa.dot.gov/files/FHWA-NHI-16-027.pdf} Preliminary analytical quantities require site calibration, construction controls and the other limit-state checks described in the manual. \end{document}

Engineering Calculator

Engineering Calculation Results