Hyperbolic settlement — observational curve fit

Shallow Foundation, Observational Settlement

By Foundation Design Method Library

276 Rank #68 Views 3,069
Workspace
QUICK ACCESS
Related engineering apps Cases & data

App-specific engineering geometry and parameter schematic

Theory and Method

\documentclass[11pt]{article} \usepackage{amsmath,amssymb,geometry,xurl,hyperref} \geometry{margin=0.85in} \setlength{\emergencystretch}{3em} \begin{document} \section{Hyperbolic settlement - observational curve fit} \subsection{Purpose} Fit a simple hyperbolic movement trend by regressing t/s against time. Three observations give the two coefficients and a residual, allowing a compact comparison with an Asaoka forecast on the same monitoring stage. \subsection{Method and governing equations} \[ \frac{t}{s}=a+bt,\qquad s(t)=\frac{t}{a+bt},\qquad s_{\infty,\mathrm{fit}}=\frac1b \] \subsection{Inputs, symbols and units} \begin{itemize} \item \textbf{First time after loading reference} ($\mathtt{t1}$): day. Default 10. \item \textbf{First positive settlement} ($\mathtt{s1}$): mm. Default 50. \item \textbf{Second time after loading reference} ($\mathtt{t2}$): day. Default 20. \item \textbf{Second positive settlement} ($\mathtt{s2}$): mm. Default 66.66666667. \item \textbf{Third time after loading reference} ($\mathtt{t3}$): day. Default 30. \item \textbf{Third positive settlement} ($\mathtt{s3}$): mm. Default 75. \item \textbf{Forecast time on the same time axis} ($\mathtt{tf}$): day. Default 90. \end{itemize} \subsection{Interpreting the results} Compare several fitting windows and future observed readings. Differences between hyperbolic and Asaoka extrapolations should prompt review of the conceptual consolidation model and data duration. \subsection{Worked default example} \begin{itemize} \item Fitted intercept a: 0.1 day/mm. \item Fitted slope b: 0.01 1/mm. \item Empirical settlement asymptote: 100 mm. \item Settlement at forecast time: 90 mm. \item Transformed fit RMS residual: 3.583229404e-17 day/mm. \end{itemize} \subsection{Verification example} The readings lie on s = t/(0.1 + 0.01t). Thus the empirical asymptote is exactly 100 mm and the forecast at 90 days is 90 mm. The verification case uses the default inputs listed above. Expected benchmark quantities: \begin{itemize} \item Fitted intercept a: 0.1. \item Fitted slope b: 0.01. \item Empirical settlement asymptote: 100. \item Settlement at forecast time: 90. \end{itemize} \subsection{Assumptions and limits} The time and settlement datum must correspond to the same loading stage and the observed trend must be increasing and decelerating. The fitted asymptote is an empirical curve parameter. This tool does not implement Tan's additional 60-90 percent consolidation calibration and does not label 1/b as proven primary settlement. Creep, changing load or drainage, and short observation windows can invalidate the extrapolation. \subsection{References} Tan and Chew (1996), Comparison of the Hyperbolic and Asaoka Observational Method of Monitoring Consolidation with Vertical Drains. Hyperbolic time/settlement plots and restrictions on observational prediction. \url{https://www.jstage.jst.go.jp/article/sandf1995/36/3/36_3_31/_article/-char/en} The app fits a two-parameter empirical hyperbola. It does not implement Tan's separate 60-90 percent consolidation calibration or equate the fitted asymptote with verified primary settlement. \end{document}

Engineering Calculator

Engineering Calculation Results