Staged embankment loading — consolidation superposition

Soil Improvement, Vertical Drains and Preloading

By Foundation Design Method Library

172 Rank #117 Views 2,474
Workspace
QUICK ACCESS
Related engineering apps Cases & data

App-specific engineering geometry and parameter schematic

Theory and Method

\documentclass[11pt]{article} \usepackage{amsmath,amssymb,geometry,xurl,hyperref} \geometry{margin=0.85in} \setlength{\emergencystretch}{3em} \begin{document} \section{Staged embankment loading - consolidation superposition} \subsection{Purpose} Superpose the primary-consolidation responses to three instantaneous load increments on one construction timeline. Future stages contribute no movement, and remaining movement is reported only for loads already applied. \subsection{Method and governing equations} \[ T_{v,i}=\frac{c_v\max(0,t-t_i)}{H_{\mathrm{dr}}^2},\qquad S(t)=\sum_{i:t\geq t_i}S_{\infty,i}U(T_{v,i}) \] \[ U(T_v)=1-\sum_{j=0}^\infty\frac8{\pi^2(2j+1)^2}\exp\left[-\frac{(2j+1)^2\pi^2T_v}{4}\right] \] \subsection{Inputs, symbols and units} \begin{itemize} \item \textbf{Constant consolidation coefficient} ($\mathtt{cv}$): m2/day. Default 0.05. \item \textbf{Drainage-path length} ($\mathtt{Hdr}$): m. Default 2. \item \textbf{Evaluation time on construction timeline} ($\mathtt{tnow}$): day. Default 120. \item \textbf{Stage 1 instantaneous load time} ($\mathtt{t1}$): day. Default 0. \item \textbf{Stage 1 eventual settlement increment} ($\mathtt{S1}$): mm. Default 100. \item \textbf{Stage 2 instantaneous load time} ($\mathtt{t2}$): day. Default 30. \item \textbf{Stage 2 eventual settlement increment} ($\mathtt{S2}$): mm. Default 80. \item \textbf{Stage 3 instantaneous load time} ($\mathtt{t3}$): day. Default 90. \item \textbf{Stage 3 eventual settlement increment} ($\mathtt{S3}$): mm. Default 60. \end{itemize} \subsection{Interpreting the results} Keep construction-stage times and monitoring records on the same time axis. The calculation can show why adding a recent load creates further settlement even after earlier stages are substantially consolidated. \subsection{Worked default example} \begin{itemize} \item Primary settlement at evaluation time: 214.6774739 mm. \item Stage 1 settlement contribution: 97.99819293 mm. \item Stage 2 settlement contribution: 75.96025259 mm. \item Stage 3 settlement contribution: 40.71902835 mm. \item Remaining settlement from already applied stages: 25.32252612 mm. \end{itemize} \subsection{Verification example} Only the first 100 mm load increment is active in the benchmark. At Tv = 1 the independent Terzaghi series gives U = 0.9312596784633337; both later stages must contribute exactly zero. The verification case changes the following default inputs; all other inputs retain the defaults listed above. \begin{itemize} \item $\mathtt{cv}=1$: m2/day. \item $\mathtt{Hdr}=1$: m. \item $\mathtt{tnow}=1$: day. \item $\mathtt{t1}=0$: day. \item $\mathtt{S1}=100$: mm. \item $\mathtt{t2}=2$: day. \item $\mathtt{S2}=100$: mm. \item $\mathtt{t3}=3$: day. \item $\mathtt{S3}=100$: mm. \end{itemize} Expected benchmark quantities: \begin{itemize} \item Primary settlement at evaluation time: 93.12596785. \item Stage 2 settlement contribution: 0. \item Stage 3 settlement contribution: 0. \item Remaining settlement from already applied stages: 6.874032154. \end{itemize} \subsection{Assumptions and limits} Linear one-dimensional Terzaghi consolidation with uniform initial excess pressure, one constant cv and one drainage path is assumed. Each eventual settlement increment must be established independently on a compatible linear stress-compressibility basis. Nonlinear NC/OC switching, unloading, changes in cv or drainage, large strain and creep invalidate simple superposition. Stages are instantaneous; a long placement period should be divided into appropriately justified increments. \subsection{References} FHWA NHI-06-088, Soils and Foundations Reference Manual, Volume I (2006). One-dimensional consolidation, compressibility and problematic soil behavior. \url{https://www.fhwa.dot.gov/engineering/geotech/pubs/nhi06088.pdf} Constant-coefficient consolidation and strain summation are applied only within their stated physical limits. \end{document}

Engineering Calculator

Engineering Calculation Results