Theis — transient confined-aquifer drawdown

Groundwater & Seepage, Pumping and Slug Tests

By Foundation Design Method Library

223 Rank #94 Views 2,945
Workspace
QUICK ACCESS
Related engineering apps Cases & data

App-specific engineering geometry and parameter schematic

Theory and Method

\documentclass[11pt]{article} \usepackage{amsmath,amssymb,geometry,xurl,hyperref} \geometry{margin=0.85in} \setlength{\emergencystretch}{3em} \begin{document} \section{Theis - transient confined-aquifer drawdown} \subsection{Purpose} Predict transient drawdown from a constant-rate pumping well without restricting the calculation to the late-time logarithmic approximation. The well function uses a convergent series for u at most 1 and an 80-level continued fraction above 1. \subsection{Method and governing equations} \[ u=\frac{r^2S}{4Tt},\qquad s=\frac{Q}{4\pi T}W(u) \] \[ W(u)=E_1(u)=\int_u^\infty \frac{e^{-v}}{v}\,dv \] \subsection{Inputs, symbols and units} \begin{itemize} \item \textbf{Constant pumping rate} ($\mathtt{Q}$): m3/day. Default 1000. \item \textbf{Aquifer transmissivity} ($\mathtt{T}$): m2/day. Default 100. \item \textbf{Aquifer storativity} ($\mathtt{S}$): -. Default 0.001. \item \textbf{Distance from pumping well} ($\mathtt{r}$): m. Default 50. \item \textbf{Time since pumping started} ($\mathtt{t}$): day. Default 1. \end{itemize} \subsection{Interpreting the results} Use several observation distances and times to check a confined-aquifer conceptual model. A measured mismatch can reveal boundary, leakage or well effects rather than a need to adjust T arbitrarily. \subsection{Worked default example} \begin{itemize} \item Theis parameter u: 0.00625 -. \item Well function W(u): 4.504198398 -. \item Predicted drawdown: 3.584327199 m. \end{itemize} \subsection{Verification example} The benchmark uses the independently tabulated exponential integral E1(1) = 0.21938393439552027 and Q/(4 pi T) = 1. Additional tests compare both numerical branches with numerical quadrature. The verification case changes the following default inputs; all other inputs retain the defaults listed above. \begin{itemize} \item $\mathtt{Q}=1256.637061$: m3/day. \item $\mathtt{T}=100$: m2/day. \item $\mathtt{S}=0.1$: -. \item $\mathtt{r}=200$: m. \item $\mathtt{t}=10$: day. \end{itemize} Expected benchmark quantities: \begin{itemize} \item Theis parameter u: 1. \item Well function W(u): 0.2193839344. \item Predicted drawdown: 0.2193839344. \end{itemize} \subsection{Assumptions and limits} The aquifer is fully confined, homogeneous, isotropic, laterally infinite and of constant thickness; the line-source well fully penetrates it. Storage in the well, leakage, partial penetration, boundaries and unconfined drainage are omitted. The bounded numerical range is 1e-9 to 100 in u. Verify that predicted head remains above the aquifer roof. \subsection{References} The Groundwater Project, An Introduction to Hydraulic Testing in Hydrogeology. Section 8.1, formulation and series for the Theis equation. \url{https://books.gw-project.org/an-introduction-to-hydraulic-testing-in-hydrogeology/chapter/formulation-of-the-theis-equation/} Constant-rate, fully penetrating line-source pumping in an infinite homogeneous confined aquifer. NIST Digital Library of Mathematical Functions, Exponential Integral. Sections 6.2, 6.6 and 6.9: E1 definition, power series and continued fraction. \url{https://dlmf.nist.gov/6.9} Numerical evaluation of the exponential integral, independently implemented in bounded scalar steps. \end{document}

Engineering Calculator

Engineering Calculation Results