Youd 2001 — SPT cyclic resistance base curve

Geotechnical Earthquake Engineering, Liquefaction Components

By Foundation Design Method Library

90 Rank #174 Views 1,602
Workspace
QUICK ACCESS
Related engineering apps Cases & data

App-specific engineering geometry and parameter schematic

Theory and Method

\documentclass[11pt]{article} \usepackage{amsmath,amssymb,geometry,xurl,hyperref} \geometry{margin=0.85in} \setlength{\emergencystretch}{3em} \begin{document} \section{Youd 2001 - SPT cyclic resistance base curve} \subsection{Purpose} Calculate the NCEER clean-sand-equivalent SPT resistance and the historical Youd et al. magnitude-7.5 base-curve CRR. The calculation starts with an already corrected N1-60 rather than raw field blow count. \subsection{Method and governing equations} \[ (N_1)_{60,cs}=\alpha+\beta(N_1)_{60} \] \[ CRR_{7.5}=\frac1{34-N_{cs}}+\frac{N_{cs}}{135}+\frac{50}{(10N_{cs}+45)^2}-\frac1{200} \] \[ \alpha=\begin{cases}0&FC\leq5\\e^{1.76-190/FC^2}&5<FC<35\\5&FC\geq35\end{cases} \] \[ \beta=\begin{cases}1&FC\leq5\\0.99+FC^{1.5}/1000&5<FC<35\\1.2&FC\geq35\end{cases} \] \subsection{Inputs, symbols and units} \begin{itemize} \item \textbf{Energy and overburden corrected SPT N1-60} ($\mathtt{N160}$): blows/0.3 m. Default 20. \item \textbf{Fines content; applicable nonplastic fines} ($\mathtt{FC}$): percent. Default 0. \end{itemize} \subsection{Interpreting the results} Pass the base resistance into a complete, consistently selected liquefaction assessment. Do not combine corrections from different procedures without checking compatibility or interpret the result as a probability of liquefaction. \subsection{Worked default example} \begin{itemize} \item Equivalent clean-sand corrected blow count: 20 blows/0.3 m. \item Magnitude-7.5 cyclic resistance ratio: 0.2154097058 -. \item Fines adjustment intercept alpha: 0 -. \item Fines adjustment multiplier beta: 1 -. \end{itemize} \subsection{Verification example} For N1-60 = 20 and FC = 0, the original base-curve expression gives 0.21540970583244634, consistent with the approximately 0.22 worked value in published applications of the procedure. The verification case uses the default inputs listed above. Expected benchmark quantities: \begin{itemize} \item Equivalent clean-sand corrected blow count: 20. \item Magnitude-7.5 cyclic resistance ratio: 0.2154097058. \item Fines adjustment intercept alpha: 0. \item Fines adjustment multiplier beta: 1. \end{itemize} \subsection{Assumptions and limits} Use only within the material and stress conditions appropriate to the original empirical procedure, including an assessment of fines plasticity and soil susceptibility. N1-60 must already include the applicable equipment, energy and overburden corrections. Ncs must be below 30; exceeding this equation's range is not automatically labelled safe. Magnitude scaling, confining and static-shear corrections, demand CSR, triggering FS and consequences are not computed here. \subsection{References} Youd et al. (2001), Liquefaction Resistance of Soils: Summary Report from the NCEER/NSF Workshops. Equation 4 and equations 5-7, SPT clean-sand base curve and fines adjustment. \url{https://doi.org/10.1061/(ASCE)1090-0241(2001)127:10(817)} Historical NCEER SPT correlation for corrected clean-sand-equivalent blow count below 30. A complete liquefaction assessment requires additional demand, magnitude, stress, applicability and consequence checks. \end{document}

Engineering Calculator

Engineering Calculation Results