Four-layer consolidation: settlement and time rate

Shallow Foundation, Settlement

By Foundation Design Example Library

410 Rank #17 Views 7,397
Workspace
QUICK ACCESS
Related engineering apps Cases & data

App-specific engineering geometry and parameter schematic

Theory and Method

\documentclass[11pt]{article} \usepackage{amsmath,amssymb,longtable,hyperref} \begin{document} \section{Four-layer consolidation: settlement and time rate} \subsection{Application and idealization} Four-layer effective-stress primary consolidation with overconsolidation and time-rate estimate. \subsection{Governing equations} $S=\sum H/(1+e_0)\left[C_r\log_{10}(\sigma_{p}/\sigma_0)+C_c\log_{10}(\sigma_f/\sigma_p)\right]$, with four layers. \subsection{Inputs, symbols and units} \begin{longtable}{p{0.16\linewidth}p{0.42\linewidth}p{0.12\linewidth}p{0.18\linewidth}} Symbol & Meaning & Unit & Default \\ deltaP & Vertical stress increment at layers & kPa & 50 \\ Cc & Compression index & - & 0.3 \\ e0 & Initial void ratio & - & 0.9 \\ Cr & Recompression index & - & 0.05 \\ t\_target & Elapsed time & yr & 1 \\ cv & Consolidation coefficient & m\(^{2}\)/yr & 1 \\ Hdr & Drainage length & m & 2 \\ H1 & Clay layer 1 thickness & m & 2 \\ sigma1 & Layer 1 initial effective stress & kPa & 40 \\ pc1 & Layer 1 preconsolidation stress & kPa & 50 \\ H2 & Clay layer 2 thickness & m & 2 \\ sigma2 & Layer 2 initial effective stress & kPa & 70 \\ pc2 & Layer 2 preconsolidation stress & kPa & 85 \\ H3 & Clay layer 3 thickness & m & 2 \\ sigma3 & Layer 3 initial effective stress & kPa & 100 \\ pc3 & Layer 3 preconsolidation stress & kPa & 120 \\ H4 & Clay layer 4 thickness & m & 2 \\ sigma4 & Layer 4 initial effective stress & kPa & 130 \\ pc4 & Layer 4 preconsolidation stress & kPa & 155 \\ \end{longtable} \subsection{Calculation procedure} Use the selected input values in the numerical method described above. The output list below states the reported quantities. Four-layer effective-stress primary consolidation with overconsolidation and time-rate estimate. \subsection{Worked example using default inputs} \begin{itemize} \item Total primary settlement: 196.74286 mm. \item Estimated degree of consolidation: 0.56418958. \item Settlement at time t: 111.00027 mm. \item Layer 1 primary settlement: 85.712897 mm. \item Layer 2 primary settlement: 51.731306 mm. \item Layer 3 primary settlement: 34.770596 mm. \item Layer 4 primary settlement: 24.528062 mm. \end{itemize} \subsection{Assumptions and interpretation} Layered 1-D effective-stress settlement with NC/recompression paths and approximate average consolidation-time relationship; evaluate stress distributions and drainage paths for the project. \subsection{Accepted input ranges} \begin{itemize} \item Vertical stress increment at layers: 0.01 to 2000 kPa. \item Compression index: 0.001 to 2 -. \item Initial void ratio: 0.1 to 5 -. \item Recompression index: 0.001 to 1 -. \item Elapsed time: 0.01 to 100 yr. \item Consolidation coefficient: 0.000001 to 1000 m\(^{2}\)/yr. \item Drainage length: 0.01 to 100 m. \item Clay layer 1 thickness: 0.01 to 100 m. \item Layer 1 initial effective stress: 0.01 to 2000 kPa. \item Layer 1 preconsolidation stress: 0.01 to 4000 kPa. \item Clay layer 2 thickness: 0.01 to 100 m. \item Layer 2 initial effective stress: 0.01 to 2000 kPa. \item Layer 2 preconsolidation stress: 0.01 to 4000 kPa. \item Clay layer 3 thickness: 0.01 to 100 m. \item Layer 3 initial effective stress: 0.01 to 2000 kPa. \item Layer 3 preconsolidation stress: 0.01 to 4000 kPa. \item Clay layer 4 thickness: 0.01 to 100 m. \item Layer 4 initial effective stress: 0.01 to 2000 kPa. \item Layer 4 preconsolidation stress: 0.01 to 4000 kPa. \end{itemize} \subsection{Reference and scope} FHWA Geotechnical Engineering Circular No. 6, Shallow Foundations (2002). \url{https://www.fhwa.dot.gov/engineering/geotech/pubs/010943.pdf} Shallow-foundation and serviceability background; the app is a bounded implementation of its stated idealization. \end{document}

Engineering Calculator

Engineering Calculation Results