Vertical drains: radial consolidation and design time

Soil Improvement, Ground Improvement

By Foundation Design Example Library

335 Rank #41 Views 7,745
Workspace
QUICK ACCESS
Related engineering apps Cases & data

App-specific engineering geometry and parameter schematic

Theory and Method

\documentclass[11pt]{article} \usepackage{amsmath,amssymb,longtable,hyperref} \begin{document} \section{Vertical drains: radial consolidation and design time} \subsection{Application and idealization} Prefabricated vertical drain radial consolidation screening with a lumped smear correction. \subsection{Governing equations} $U_h=1-\exp[-8c_ht/(D_e^2F)]$ with $F\approx\ln(n)-3/4+F_{smear}$. \subsection{Inputs, symbols and units} \begin{longtable}{p{0.16\linewidth}p{0.42\linewidth}p{0.12\linewidth}p{0.18\linewidth}} Symbol & Meaning & Unit & Default \\ spacing & Drain square-grid spacing & m & 1.2 \\ drain\_diameter & Equivalent drain diameter & m & 0.06 \\ ch & Horizontal consolidation coefficient & m\(^{2}\)/day & 0.0005 \\ smear\_factor & Smear/well resistance factor added to F & - & 0.25 \\ vertical\_time & Analysis time & day & 365 \\ target\_U & Target degree of radial consolidation & - & 0.9 \\ \end{longtable} \subsection{Calculation procedure} Use the selected input values in the numerical method described above. The output list below states the reported quantities. Prefabricated vertical drain radial consolidation screening with a lumped smear correction. \subsection{Worked example using default inputs} \begin{itemize} \item Equivalent drain diameter: 1.356 m. \item Drain spacing ratio n: 22.6. \item Average radial consolidation: 0.26162231. \item Time for target radial consolidation: 2770.9993 day. \item Target degree: 0.9. \end{itemize} \subsection{Assumptions and interpretation} Barron/Hansbo-style simplified equal-strain radial consolidation; smear resistance and well resistance are represented only through an input factor. Units ch m\(^{2}\)/day, time day. \subsection{Accepted input ranges} \begin{itemize} \item Drain square-grid spacing: 0.1 to 10 m. \item Equivalent drain diameter: 0.005 to 0.5 m. \item Horizontal consolidation coefficient: 1e-8 to 5 m\(^{2}\)/day. \item Smear/well resistance factor added to F: 0 to 10 -. \item Analysis time: 0.01 to 100000 day. \item Target degree of radial consolidation: 0.01 to 0.999 -. \end{itemize} \subsection{Reference and scope} FHWA Ground Improvement guidance and GEC No. 13 reference manuals. \url{https://www.fhwa.dot.gov/engineering/geotech/improvement/index.cfm} Ground modification concepts; the app covers the listed mechanism rather than a complete improvement design. \end{document}

Engineering Calculator

Engineering Calculation Results