One-dimensional consolidation: degree and settlement versus time

Shallow Foundation, Settlement

By Foundation Design Method Library

28 Rank #234 Views 566
Workspace
QUICK ACCESS
Related engineering apps Cases & data

App-specific engineering geometry and parameter schematic

Theory and Method

\documentclass[11pt]{article} \usepackage{amsmath,amssymb,longtable,hyperref} \begin{document} \section{One-dimensional consolidation: degree and settlement versus time} \subsection{Application and idealization} Solve Terzaghi one-dimensional average consolidation for constant loading and drainage using the first 12 terms of the exact eigenfunction series. \subsection{Governing equations} \[ T_v=c_v t/H_{dr}^2 \] \[ U(T_v)=1-\frac{8}{\pi^2}\sum_{n=0}^{\infty}\frac{\exp[-(2n+1)^2\pi^2T_v/4]}{(2n+1)^2} \] \[ S(t)=U(t)S_{\infty} \] \subsection{Inputs, symbols and units} \begin{longtable}{p{0.16\linewidth}p{0.42\linewidth}p{0.12\linewidth}p{0.18\linewidth}} Symbol & Meaning & Unit & Default \\ cv & Coefficient of consolidation & m\(^{2}\)/year & 1.5 \\ Hdr & Maximum drainage path & m & 1.2 \\ t & Elapsed time & years & 1.5 \\ Sinf & Final primary consolidation settlement & mm & 95 \\ \end{longtable} \subsection{Calculation procedure} \[ \mathrm{Tv} = \frac{\mathrm{cv}\,t}{\mathrm{Hdr}^{2}} \] \[ U = 1-\frac{8}{\pi^{2}}\,\left(\frac{\operatorname{exp}\left(\frac{-\left(1\right)\,\pi^{2}\,\mathrm{Tv}}{4}\right)}{1}+\frac{\operatorname{exp}\left(\frac{-\left(9\right)\,\pi^{2}\,\mathrm{Tv}}{4}\right)}{9}+\frac{\operatorname{exp}\left(\frac{-\left(25\right)\,\pi^{2}\,\mathrm{Tv}}{4}\right)}{25}+\frac{\operatorname{exp}\left(\frac{-\left(49\right)\,\pi^{2}\,\mathrm{Tv}}{4}\right)}{49}+\frac{\operatorname{exp}\left(\frac{-\left(81\right)\,\pi^{2}\,\mathrm{Tv}}{4}\right)}{81}+\frac{\operatorname{exp}\left(\frac{-\left(121\right)\,\pi^{2}\,\mathrm{Tv}}{4}\right)}{121}+\frac{\operatorname{exp}\left(\frac{-\left(169\right)\,\pi^{2}\,\mathrm{Tv}}{4}\right)}{169}+\frac{\operatorname{exp}\left(\frac{-\left(225\right)\,\pi^{2}\,\mathrm{Tv}}{4}\right)}{225}+\frac{\operatorname{exp}\left(\frac{-\left(289\right)\,\pi^{2}\,\mathrm{Tv}}{4}\right)}{289}+\frac{\operatorname{exp}\left(\frac{-\left(361\right)\,\pi^{2}\,\mathrm{Tv}}{4}\right)}{361}+\frac{\operatorname{exp}\left(\frac{-\left(441\right)\,\pi^{2}\,\mathrm{Tv}}{4}\right)}{441}+\frac{\operatorname{exp}\left(\frac{-\left(529\right)\,\pi^{2}\,\mathrm{Tv}}{4}\right)}{529}\right) \] \[ \mathrm{Settlement} = \operatorname{max}\left(0,\operatorname{min}\left(U,1\right)\right)\,\mathrm{Sinf} \] \begin{itemize} \item Time factor Tv: \( \mathrm{Tv} \). \item Average degree of consolidation: \( U\,100 \). \item Primary consolidation settlement at time t: \( \mathrm{Settlement} \). \item Remaining primary settlement: \( \mathrm{Sinf}-\mathrm{Settlement} \). \end{itemize} \subsection{Worked example using default inputs} \begin{itemize} \item Time factor Tv: 1.5625. \item Average degree of consolidation: 98.284272 \%. \item Primary consolidation settlement at time t: 93.370058 mm. \item Remaining primary settlement: 1.629942 mm. \end{itemize} \subsection{Assumptions and interpretation} Constant cv, one-dimensional vertical drainage, instantaneous load, constant final settlement, no creep; initial very-short-time response has a finite truncation error. \subsection{Accepted input ranges} \begin{itemize} \item Coefficient of consolidation: 0.00001 to 1000 m\(^{2}\)/year. \item Maximum drainage path: 0.02 to 100 m. \item Elapsed time: 0.001 to 1000 years. \item Final primary consolidation settlement: 0 to 10000 mm. \end{itemize} \subsection{Reference and scope} FHWA Geotechnical Engineering Circular No. 6, Shallow Foundations (2002). \url{https://www.fhwa.dot.gov/engineering/geotech/pubs/010943.pdf} Shallow-foundation and serviceability background; the app is a bounded implementation of its stated idealization. \end{document}

Engineering Calculator

Engineering Calculation Results