Borrow and fill — dry-mass balance with handling loss

Earthworks & Construction, Earthwork Quantities

By Foundation Design Method Library

111 Rank #148 Views 2,129
Workspace
QUICK ACCESS
Related engineering apps Cases & data

App-specific engineering geometry and parameter schematic

Theory and Method

\documentclass[11pt]{article} \usepackage{amsmath,amssymb,geometry,xurl,hyperref} \geometry{margin=0.85in} \setlength{\emergencystretch}{3em} \begin{document} \section{Borrow and fill - dry-mass balance with handling loss} \subsection{Purpose} Convert bank excavation to compacted fill using conserved dry mass and an explicit handling-loss allowance. \subsection{Governing equations} \[ V_{fill}=\frac{V_{bank}\rho_{d,bank}(1-\ell)}{\rho_{d,fill}} \] \subsection{Inputs and units} \begin{itemize} \item \textbf{Available bank volume} ($\mathtt{Vbank}$): m3. Default 1000. \item \textbf{Bank dry density} ($\mathtt{rhobank}$): Mg/m3. Default 1.6. \item \textbf{Required compacted dry density} ($\mathtt{rhofill}$): Mg/m3. Default 1.8. \item \textbf{Required compacted fill volume} ($\mathtt{Vneed}$): m3. Default 1000. \item \textbf{Dry-solids handling loss} ($\mathtt{loss}$): \%. Default 5. \end{itemize} \subsection{How to use the result} Enter values on the stated measurement and unit basis. Intermediate quantities are calculated in the order shown in the downloadable method. Interpret the reported quantities within the physical assumptions below. \begin{itemize} \item Usable dry mass: t. \item Compacted fill yield: m3. \item Additional bank borrow required: m3. \end{itemize} \subsection{Worked default example} \begin{itemize} \item Usable dry mass: 1520 t. \item Compacted fill yield: 844.444444 m3. \item Additional bank borrow required: 184.210526 m3. \end{itemize} \subsection{Verification example} A separate hand-checkable or limiting-case benchmark uses the following inputs: \begin{itemize} \item $\mathtt{Vbank}=1000$: m3. \item $\mathtt{rhobank}=1.5$: Mg/m3. \item $\mathtt{rhofill}=2$: Mg/m3. \item $\mathtt{Vneed}=1000$: m3. \item $\mathtt{loss}=0$: \%. \end{itemize} Expected benchmark quantities: \begin{itemize} \item Usable dry mass: 1500. \item Compacted fill yield: 750. \item Additional bank borrow required: 333.333333. \end{itemize} \subsection{Assumptions and limits} Requires representative dry densities. Water added during placement changes wet mass but not dry-solids yield. Unsuitable material rejection is included only if represented by the supplied loss. \subsection{Reference} FHWA Soils and Foundations Reference Manual - earthwork and construction background. \url{https://www.fhwa.dot.gov/engineering/geotech/pubs/nhi06088.pdf} Compaction and soil-construction context. Quantity equations are geometric or mass-conservation derivations, not empirical design recommendations. \end{document}

Engineering Calculator

Engineering Calculation Results