Geotextile filter — cross-plane flow and required area

Groundwater & Seepage, Filters & Geosynthetics

By Foundation Design Method Library

166 Rank #120 Views 3,515
Workspace
QUICK ACCESS
Related engineering apps Cases & data

App-specific engineering geometry and parameter schematic

Theory and Method

\documentclass[11pt]{article} \usepackage{amsmath,amssymb,geometry,xurl,hyperref} \geometry{margin=0.85in} \setlength{\emergencystretch}{3em} \begin{document} \section{Geotextile filter - cross-plane flow and required area} \subsection{Purpose} Translate laboratory permittivity into a reduced cross-plane drainage capacity for a selected fabric area. \subsection{Governing equations} \[ q_d=\frac{\psi\Delta h}{RF},\quad Q=q_d A \] \subsection{Inputs and units} \begin{itemize} \item \textbf{Measured permittivity} ($\mathtt{psi}$): 1/s. Default 0.8. \item \textbf{Head difference across fabric} ($\mathtt{dh}$): m. Default 0.1. \item \textbf{Available flow area} ($\mathtt{A}$): m2. Default 4. \item \textbf{Required flow} ($\mathtt{Qreq}$): L/s. Default 20. \item \textbf{Combined hydraulic reduction factor} ($\mathtt{RF}$): -. Default 3. \end{itemize} \subsection{How to use the result} Enter values on the stated measurement and unit basis. Intermediate quantities are calculated in the order shown in the downloadable method. Interpret the reported quantities within the physical assumptions below. \begin{itemize} \item Reduced design flux: m/s. \item Available cross-plane discharge: L/s. \item Required flow area: m2. \end{itemize} \subsection{Worked default example} \begin{itemize} \item Reduced design flux: 0.0266666667 m/s. \item Available cross-plane discharge: 106.666667 L/s. \item Required flow area: 0.75 m2. \end{itemize} \subsection{Verification example} A separate hand-checkable or limiting-case benchmark uses the following inputs: \begin{itemize} \item $\mathtt{psi}=1$: 1/s. \item $\mathtt{dh}=0.1$: m. \item $\mathtt{A}=2$: m2. \item $\mathtt{Qreq}=50$: L/s. \item $\mathtt{RF}=2$: -. \end{itemize} Expected benchmark quantities: \begin{itemize} \item Reduced design flux: 0.05. \item Available cross-plane discharge: 100. \item Required flow area: 1. \end{itemize} \subsection{Assumptions and limits} Reduction factor is supplied for the project and must address relevant clogging, intrusion and aging. Retention and survivability are separate checks; no product recommendation is made. \subsection{Reference} USACE EM 1110-2-1901, Seepage Analysis and Control for Dams. \url{https://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_1110-2-1901.pdf} Head, anisotropy, seepage and drain/filter concepts; project-specific filter criteria must be selected. \end{document}

Engineering Calculator

Engineering Calculation Results