Uniform recharge — water-table mound between drains

Groundwater & Seepage, Drainage

By Foundation Design Method Library

55 Rank #203 Views 647
Workspace
QUICK ACCESS
Related engineering apps Cases & data

App-specific engineering geometry and parameter schematic

Theory and Method

\documentclass[11pt]{article} \usepackage{amsmath,amssymb,geometry,xurl,hyperref} \geometry{margin=0.85in} \setlength{\emergencystretch}{3em} \begin{document} \section{Uniform recharge - water-table mound between drains} \subsection{Purpose} Estimate the maximum steady recharge mound midway between equally spaced parallel drains. \subsection{Governing equations} \[ h_c^2=h_0^2+\frac{RL^2}{k},\quad q_{side}=RL \] \subsection{Inputs and units} \begin{itemize} \item \textbf{Uniform recharge rate} ($\mathtt{R}$): mm/day. Default 5. \item \textbf{Half-distance from midpoint to drain} ($\mathtt{L}$): m. Default 20. \item \textbf{Hydraulic conductivity} ($\mathtt{k}$): m/day. Default 1. \item \textbf{Water depth at drains above base} ($\mathtt{h0}$): m. Default 2. \end{itemize} \subsection{How to use the result} Enter values on the stated measurement and unit basis. Intermediate quantities are calculated in the order shown in the downloadable method. Interpret the reported quantities within the physical assumptions below. \begin{itemize} \item Midpoint saturated thickness: m. \item Midpoint mound above drain water level: m. \item Drain inflow per unit length per side: m3/day/m. \end{itemize} \subsection{Worked default example} \begin{itemize} \item Midpoint saturated thickness: 2.44948974 m. \item Midpoint mound above drain water level: 0.449489743 m. \item Drain inflow per unit length per side: 0.1 m3/day/m. \end{itemize} \subsection{Verification example} A separate hand-checkable or limiting-case benchmark uses the following inputs: \begin{itemize} \item $\mathtt{R}=10$: mm/day. \item $\mathtt{L}=10$: m. \item $\mathtt{k}=1$: m/day. \item $\mathtt{h0}=0.01$: m. \end{itemize} Expected benchmark quantities: \begin{itemize} \item Midpoint saturated thickness: 1.00005. \item Drain inflow per unit length per side: 0.1. \end{itemize} \subsection{Assumptions and limits} L is half the full drain spacing. Uniform recharge, horizontal base, homogeneous conductivity and Dupuit flow are assumed. The formula does not account for perched layers or unsaturated delay. \subsection{Reference} Lohman (1972), Ground-Water Hydraulics, USGS Professional Paper 708. \url{https://pubs.usgs.gov/publication/pp708} Darcy flow, steady pumping and late-time aquifer-test equations. Each app states its own boundary conditions. \end{document}

Engineering Calculator

Engineering Calculation Results