Wick-drain installation — triangular-grid material quantity

Earthworks & Construction, Ground Improvement Quantities

By Foundation Design Method Library

99 Rank #165 Views 1,551
Workspace
QUICK ACCESS
Related engineering apps Cases & data

App-specific engineering geometry and parameter schematic

Theory and Method

\documentclass[11pt]{article} \usepackage{amsmath,amssymb,geometry,xurl,hyperref} \geometry{margin=0.85in} \setlength{\emergencystretch}{3em} \begin{document} \section{Wick-drain installation - triangular-grid material quantity} \subsection{Purpose} Estimate installed wick-drain count and material length for a triangular layout. \subsection{Governing equations} \[ A_{cell}=\frac{\sqrt3}{2}s^2,\quad N=\lceil A/A_{cell}\rceil,\quad L_{total}=N(H+L_{allow}) \] \subsection{Inputs and units} \begin{itemize} \item \textbf{Treatment plan area} ($\mathtt{area}$): m2. Default 10000. \item \textbf{Triangular-grid center spacing} ($\mathtt{s}$): m. Default 1.5. \item \textbf{Installed drain depth} ($\mathtt{depth}$): m. Default 20. \item \textbf{Allowance per drain for tail and waste} ($\mathtt{tail}$): m. Default 1. \end{itemize} \subsection{How to use the result} Enter values on the stated measurement and unit basis. Intermediate quantities are calculated in the order shown in the downloadable method. Interpret the reported quantities within the physical assumptions below. \begin{itemize} \item Triangular tributary area per drain: m2. \item Area-based drain count: drains. \item Drain material length including allowance: m. \end{itemize} \subsection{Worked default example} \begin{itemize} \item Triangular tributary area per drain: 1.94855716 m2. \item Area-based drain count: 5133 drains. \item Drain material length including allowance: 107793 m. \end{itemize} \subsection{Verification example} A separate hand-checkable or limiting-case benchmark uses the following inputs: \begin{itemize} \item $\mathtt{area}=86.6025404$: m2. \item $\mathtt{s}=1$: m. \item $\mathtt{depth}=10$: m. \item $\mathtt{tail}=1$: m. \end{itemize} Expected benchmark quantities: \begin{itemize} \item Triangular tributary area per drain: 0.866025404. \item Area-based drain count: 100. \item Drain material length including allowance: 1100. \end{itemize} \subsection{Assumptions and limits} An area estimate does not resolve boundary rows, obstructions, excluded zones or installation tolerances. Drain spacing and depth must first be selected by a consolidation and constructability design. \subsection{Reference} FHWA Soils and Foundations Reference Manual - earthwork and construction background. \url{https://www.fhwa.dot.gov/engineering/geotech/pubs/nhi06088.pdf} Compaction and soil-construction context. Quantity equations are geometric or mass-conservation derivations, not empirical design recommendations. \end{document}

Engineering Calculator

Engineering Calculation Results