public-link · Publisher-hosted; redistribution permission not established · Checked 2026-11-22Yeager Airport — reinforced-slope failure and degraded rock
The reinforced slope supporting a runway extension failed in 2015. Published investigations examine the fill–rock interface, material strength selection and global failure mechanisms, offering a strong forensic capstone.
Project evidence
Design & engineering
Partial recordThe author studies discuss construction, performance and post-failure testing. The reinforced-slope height is reported differently across papers; retain the geometry and datum of the particular section being analysed instead of merging those values.
Cost & estimating
Not located in cited sourcesA project-specific estimate, bid schedule or final account was not found in the reviewed sources.
Schedule & construction
Partial recordThe failure occurred on 12 March 2015 after several years of service. The published papers separately describe construction and the observed pre-failure movements.
Completion & performance
Partial recordPost-failure investigation and analyses are documented; these sources are not a complete record of the later repair and acceptance programme.
Engineering methods
Published quantities & cost references
These values retain the scope and date basis of their cited source. Estimates, alternatives and partial packages are identified individually.
| Item | Reported value | Scope & source |
|---|---|---|
| Slope height stated by Collin et al. | 67 m | Reinforced-soil slope height in the Geotextiles and Geomembranes case-history title; retain that paper’s definition.As reported by the cited project source; not a universal design input.Source s2 · Article title and case description |
| Slope height stated by VandenBerge et al. | 73 m | Height used in the ASCE case-history description; consult geometry and reference elevations before comparing with 67 m.Source-specific geometry definition. The two published heights are not averaged or silently treated as interchangeable.Source s1 · Case-history description |
Suggested teaching exercise
Capstone project brief
Reconstruct a documented failure section and compare competing strength and groundwater assumptions against the observed failure geometry.
Starting information & inputs
- Extract one internally consistent cross-section, foundation preparation detail and chronology from the selected author paper.
- Separate coarse reinforced-fill test results from softened or residual strengths at the fill–rock interface, recording drainage and sample scale.
Suggested deliverables
- Compare internal, compound and global mechanisms with sensitivity to interface strength and pore pressure.
- Prepare an improved investigation, construction-observation and movement-trigger plan, clearly distinguished from the actual historical design.
- A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.
- A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points.
Design questions
- Why can strong geogrid and competent reinforced fill fail to prevent a mechanism controlled by the underlying weathered-rock interface?
- What would make a back-calculated strength plausible as a material property, rather than merely compensating for an incorrect geometry or groundwater model?
Sources & original records
Collin and coauthors / Geotextiles and Geomembranes
public-link · Publisher-hosted; redistribution permission not established · Checked 2026-11-22Investigation authors / The Collin Group
public-link · Publisher-hosted; redistribution permission not established · Checked 2026-11-22Designism · 2026
Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.
public-link · CC0 · Checked 2026-11-22