Docs / DS 13, Chapter 10

Published first page of USBR DS 13, Chapter 10 — Embankment Construction

USBR DS 13, Chapter 10 — Embankment Construction

Specify and control embankment placement, moisture and compaction.

Dams and leveesEarthworks and compactionConstruction, inspection and acceptance

Scope & use

Download PDF

110 pages · 4.8 MB · Original published document

Specify and control embankment placement, moisture and compaction. Published as a separate chapter within Design Standards No. 13, Embankment Dams.

Edition and application

Published reference; confirm the governing contract, jurisdiction and applicable revisions.

Sources & original records

USBR DS 13, Chapter 10 — Embankment Construction ↗

Bureau of Reclamation · 2012

Chapter and date verified in Reclamation’s Design Standards table; original government publication retained without modification.

official-free · U.S. Government work; original published document with embedded third-party credits retained. · Checked 2026-11-22