Stockholm Arlanda Airport, the operating facility served by aquifer thermal energy storage. The subsurface wells and storage zones are not visible in this aerial photograph.

Swedavia · 2009

Stockholm Arlanda — aquifer thermal energy storage

The airport uses warm and cold groundwater zones within an esker aquifer for seasonal energy exchange. This case links well hydraulics and thermal transport with operational heating and cooling demand.

Ground-source energyDewatering and groundwaterSite investigation
The marked former Oranje-Nassau III shaft in Heerlerheide, part of the mining legacy underlying the Heerlen minewater project. This is a historic mine-site feature, not a photograph of an operational heat-extraction well.

Mijnwater / Municipality of Heerlen · 2014

Heerlen — heat recovery and storage in flooded mines

Flooded coal-mine workings provide thermal resources and storage for a district network. Published project accounts explain the transition from extracting mine heat to exchanging and regenerating it through building clusters.

Ground-source energyRock slopes and foundationsDewatering and groundwater
Halley VI Research Station, with its modules elevated on hydraulic legs above the snow surface. The ski-supported arrangement allows lifting and relocation.

British Antarctic Survey · 2017

Halley VI — relocatable foundations on accumulating snow

The Antarctic station sits on ski-supported hydraulic legs that allow annual raising and relocation. This is a foundation-maintenance and construction-logistics case on moving, accumulating snow and ice.

Permafrost and cold regionsShallow foundationsSettlement and consolidation
The completed elevated Amundsen–Scott South Pole Station in the 2007–2008 summer season. The site photograph provides context for the support-column settlement surveys; it is not a current condition inspection.

National Science Foundation / U.S. Antarctic Program · 2019

South Pole Station — snow-foundation settlement and levelling

The elevated station experiences nonuniform support-column settlement in deep permanent snow. USACE reports analyze surveys, floor levelness and maintenance decisions, making a useful observational-design case.

Permafrost and cold regionsSettlement and consolidationShallow foundations
I-70 in Glenwood Canyon, showing the constrained highway setting. The linked engineering sources distinguish particular reinforced-soil wall test sections from the broader corridor shown here.

Colorado Department of Transportation · 1992

Glenwood Canyon — reinforced walls on compressible foundations

Constrained highway construction used retaining structures in a river canyon. The reinforced-wall studies examine movement over compressible deposits and the importance of separating reinforced-fill performance from foundation settlement.

Reinforced soil and geosyntheticsRetaining walls and anchorsSettlement and consolidation
Rocky Flats in 2007 after removal of the former industrial buildings. The broad site view does not establish the location or condition of individual landfill-cover layers or groundwater treatment cells.

U.S. Department of Energy, Office of Legacy Management · 2026

Rocky Flats — engineered covers and long-term groundwater care

The remediated site retains engineered landfill covers, groundwater collection/treatment systems and long-term inspections. Public surveillance records support a capstone on containment performance after closure.

Contaminated ground and waste barriersSeepage and internal erosionSoil slopes and landslides
The Berkeley Pit in Butte, Montana, photographed in 2013. The image shows the actual flooded pit; water-level controls and treatment performance should be read from the dated monitoring records.

EPA oversight / responsible mining parties · 2025

Berkeley Pit — mine flooding and hydraulic containment

The flooded open pit and connected underground mine workings require water-level management and treatment. Public monitoring records link hydraulic containment with an ongoing remediation operation.

Contaminated ground and waste barriersDewatering and groundwaterRock slopes and foundations
Sutong Bridge during construction. The image shows the actual crossing; detailed shaft groups, pile-cap geometry and scour protection are described in the project engineering papers.

Sutong Bridge project authorities · 2008

Sutong Bridge — deep pile groups and riverbed scour protection

The main pylons use large groups of long drilled shafts in deep water and soft ground. Project papers connect testing, pile-group analysis, post-grouting, cofferdam construction and permanent scour protection.

Piles and drilled shaftsLateral foundations and interactionScour and erosion protection
Hywind Scotland photographed from the sea on 22 June 2022. The turbine spars are visible above the water; the suction anchors and mooring arrangements are described in the linked project records.

Equinor / Masdar · 2017

Hywind Scotland — suction anchors for floating wind

Five floating turbines use mooring systems connected to seabed suction anchors. Project and decommissioning material support an integrated study of anchor capacity, installation, inspection and eventual removal.

Coastal and offshore foundationsLateral foundations and interactionSite investigation
The Eastern Scheldt storm-surge barrier viewed from Westerschouwen in January 2025. Its submerged foundation mats and scour-protection layers are explained in the engineering sources, rather than inferred from this surface view.

Rijkswaterstaat · 1986

Eastern Scheldt Barrier — foundation mats and scour resilience

The movable barrier retains tidal exchange while closing during severe water levels. Its foundation and bed-protection concepts provide a case on erosion resistance, interface stability and long-term renewal of marine structures.

Coastal and offshore foundationsShallow foundationsScour and erosion protection
Construction of the MOSE project at the Lido inlet, Venice, in mid-2009. This is a construction-stage photograph; the later operational barrier and monitoring results are described separately.

Italian Ministry of Infrastructure / MOSE project · 2025

Venice MOSE — marine caisson placement and movement monitoring

The movable lagoon barriers rely on accurately positioned marine caissons and controlled differential movement. Designer accounts and published deformation surveys connect foundation construction with operational alignment requirements.

Coastal and offshore foundationsShallow foundationsSettlement and consolidation
Yeager Airport photographed on 20 October 2026. This later site view is context for the 2015 reinforced-slope failure; it is not an image of the failure itself or a reconstruction drawing.

Central West Virginia Regional Airport Authority · 2015

Yeager Airport — reinforced-slope failure and degraded rock

The reinforced slope supporting a runway extension failed in 2015. Published investigations examine the fill–rock interface, material strength selection and global failure mechanisms, offering a strong forensic capstone.

Reinforced soil and geosyntheticsSoil slopes and landslidesRock slopes and foundations

From project evidence to a design study

Each case separates documented project decisions and available records from a suggested capstone exercise. Missing final designs, costs, schedules or completion records are identified. A teaching exercise may require additional assumptions, site investigation or instructor-supplied inputs.

Topic coverage

Projects may address several topics. Counts below represent relevant project records, not independent examples for every method.