Foundation Design · Cases

Find Engineering Cases

Documented projects, design decisions and lessons for engineering practice and capstone studies.

Owner, location & access
Clear filters

43 of 117 project case studies

Aerial view of the raised San Vicente Dam and reservoir in San Diego County.

San Diego County Water Authority · 2014

San Vicente Dam raise — rock preparation and RCC interface

The existing concrete dam was raised using roller-compacted concrete. Owner documents connect excavation to competent rock, treatment of localized poor material and seepage control with the enlarged structure.

Rock slopes and foundationsDams and leveesSeepage and internal erosion
Aerial view of Calaveras Reservoir during reconstruction of the dam.

San Francisco Public Utilities Commission · 2019

Calaveras Dam replacement — seismic foundations and unexpected landslides

Replacement of a seismically vulnerable dam encountered an additional ancient landslide during abutment excavation. Public environmental and budget records document supplemental investigation, design revisions and delivery consequences.

Dams and leveesEarthquakes and liquefactionSoil slopes and landslides
Seepage east of and below the Mosul Dam spillway.

Iraq Ministry of Water Resources · 2019

Mosul Dam — maintenance grouting in soluble foundations

The dam overlies soluble limestone and gypsum. A rehabilitation programme strengthened maintenance grouting, equipment and instrumentation; continuing operation depends on sustained foundation management.

Dams and leveesSeepage and internal erosionRock slopes and foundations
Faido crossover area in the Gotthard Base Tunnel during construction in 2014.

AlpTransit Gotthard · 2016

Gotthard Base Tunnel — squeezing rock and adaptive support

Deep tunnel sections encountered squeezing rock and strongly variable geological behavior. The Swiss geotechnical society’s project history explains both anticipated and unexpected support challenges at Sedrun and Faido.

Tunnels and underground worksRock slopes and foundationsSite investigation
Thames Tideway Tunnel construction at Nine Elms, London.

Tideway · 2022

Thames Tideway Tunnel — variable geology and deep shafts

The sewer tunnel crosses the London Basin sequence from clay into water-bearing chalk. Project engineers explain how geological observations and groundwater pressure influenced excavation methods and construction performance.

Tunnels and underground worksDewatering and groundwaterSite investigation
Construction of the future 86th Street station in November 2013.

Metropolitan Transportation Authority · 2017

Second Avenue Subway Phase 1 — ground freezing at a TBM launch

Unexpected poor ground near the east running-tunnel launch required a revised sequence. The construction manager describes soil freezing while the TBM first advanced through the western alignment.

Tunnels and underground worksGround improvementMonitoring and observational design
City Rail Link construction on Albert Street in Auckland.

City Rail Link Limited · 2023

Auckland City Rail Link — ground models and settlement baselines

The urban rail link traverses weak rock, younger sediments, volcanic material and reclamation. Project engineers describe how phased investigations and a shared three-dimensional ground model informed procurement and risk allocation.

Tunnels and underground worksSite investigationMonitoring and observational design
The Nicoll Highway collapse site photographed in April 2024.

Singapore Land Transport Authority / Committee of Inquiry · 2004

Nicoll Highway collapse — excavation design and monitoring decisions

The official inquiry identified errors in retaining-wall and strut-connection design and failures to respond adequately to warning signs. The case joins ground-model selection, temporary-structure detailing and construction governance.

Excavation supportRetaining walls and anchorsMonitoring and observational design
The ETH Hönggerberg campus, where the anergy grid exchanges heat with borehole fields. This site-context photograph does not show the buried HC4 boreholes.

ETH Zurich · 2025

ETH Hönggerberg — seasonal borehole heat storage

The campus anergy grid balances heating and cooling through buried borehole fields. Its documented HC4 expansion provides a practical study of thermal interference, drilling access and staged commissioning.

Ground-source energySite investigationDewatering and groundwater
The entrance to the Svalbard Global Seed Vault in February 2020, after the 2016–2019 upgrade period. The photograph shows the actual facility; buried tunnel details are documented by the linked owner sources.

Norwegian Ministry of Agriculture and Food / Statsbygg · 2019

Svalbard Seed Vault — tunnel waterproofing and frozen ground

The Seed Vault upgrade replaced its access tunnel with a watertight concrete structure and moved heat-producing services. The construction account includes artificial ground freezing to support the replacement works.

Permafrost and cold regionsTunnels and underground worksGround improvement
Halley VI Research Station, with its modules elevated on hydraulic legs above the snow surface. The ski-supported arrangement allows lifting and relocation.

British Antarctic Survey · 2017

Halley VI — relocatable foundations on accumulating snow

The Antarctic station sits on ski-supported hydraulic legs that allow annual raising and relocation. This is a foundation-maintenance and construction-logistics case on moving, accumulating snow and ice.

Permafrost and cold regionsShallow foundationsSettlement and consolidation
I-70 in Glenwood Canyon, showing the constrained highway setting. The linked engineering sources distinguish particular reinforced-soil wall test sections from the broader corridor shown here.

Colorado Department of Transportation · 1992

Glenwood Canyon — reinforced walls on compressible foundations

Constrained highway construction used retaining structures in a river canyon. The reinforced-wall studies examine movement over compressible deposits and the importance of separating reinforced-fill performance from foundation settlement.

Reinforced soil and geosyntheticsRetaining walls and anchorsSettlement and consolidation
The Osman Gazi Bridge across Izmit Bay. The buried and submerged foundation details are documented in the linked design and construction sources.

Gebze–Orhangazi–Izmir motorway project · 2016

Osman Gazi Bridge — seismic caissons on gravel beds

The suspension bridge combines offshore caisson foundations with improved ground and a gravel interface intended to accommodate extreme seismic movement. Published accounts describe soil–structure interaction and marine installation.

Lateral foundations and interactionEarthquakes and liquefactionGround improvement
Hywind Scotland photographed from the sea on 22 June 2022. The turbine spars are visible above the water; the suction anchors and mooring arrangements are described in the linked project records.

Equinor / Masdar · 2017

Hywind Scotland — suction anchors for floating wind

Five floating turbines use mooring systems connected to seabed suction anchors. Project and decommissioning material support an integrated study of anchor capacity, installation, inspection and eventual removal.

Coastal and offshore foundationsLateral foundations and interactionSite investigation
The Eastern Scheldt storm-surge barrier viewed from Westerschouwen in January 2025. Its submerged foundation mats and scour-protection layers are explained in the engineering sources, rather than inferred from this surface view.

Rijkswaterstaat · 1986

Eastern Scheldt Barrier — foundation mats and scour resilience

The movable barrier retains tidal exchange while closing during severe water levels. Its foundation and bed-protection concepts provide a case on erosion resistance, interface stability and long-term renewal of marine structures.

Coastal and offshore foundationsShallow foundationsScour and erosion protection
Construction of the MOSE project at the Lido inlet, Venice, in mid-2009. This is a construction-stage photograph; the later operational barrier and monitoring results are described separately.

Italian Ministry of Infrastructure / MOSE project · 2025

Venice MOSE — marine caisson placement and movement monitoring

The movable lagoon barriers rely on accurately positioned marine caissons and controlled differential movement. Designer accounts and published deformation surveys connect foundation construction with operational alignment requirements.

Coastal and offshore foundationsShallow foundationsSettlement and consolidation

From project evidence to a design study

Each case separates documented project decisions and available records from a suggested capstone exercise. Missing final designs, costs, schedules or completion records are identified. A teaching exercise may require additional assumptions, site investigation or instructor-supplied inputs.

Topic coverage

Projects may address several topics. Counts below represent relevant project records, not independent examples for every method.