A person standing beside damaged buildings and the failed ground after the 1978 Rissa landslide.

Historic landslide investigation / Norwegian Geotechnical Institute · 1978

Rissa landslide — sensitive clay and retrogressive failure

The quick-clay landslide was filmed during retrogressive movement. NGI explains the remoulding mechanism and publishes strength and geometry evidence used in stability interpretation.

Soil slopes and landslidesExpansive, collapsible and organic soilsLaboratory testing and parameters
Buildings affected by soil liquefaction during the 1964 Niigata earthquake.

Japanese earthquake investigators · 1964

Niigata earthquake — contrasting liquefied and non-liquefied sites

Published investigations compare sites that did and did not liquefy, linking penetration tests, recovered sand samples and cyclic strength. Building tilting demonstrates the importance of ground response even when the superstructure remains comparatively intact.

Earthquakes and liquefactionLaboratory testing and parametersSite investigation
The ETH Hönggerberg campus, where the anergy grid exchanges heat with borehole fields. This site-context photograph does not show the buried HC4 boreholes.

ETH Zurich · 2025

ETH Hönggerberg — seasonal borehole heat storage

The campus anergy grid balances heating and cooling through buried borehole fields. Its documented HC4 expansion provides a practical study of thermal interference, drilling access and staged commissioning.

Ground-source energySite investigationDewatering and groundwater
Stockholm Arlanda Airport, the operating facility served by aquifer thermal energy storage. The subsurface wells and storage zones are not visible in this aerial photograph.

Swedavia · 2009

Stockholm Arlanda — aquifer thermal energy storage

The airport uses warm and cold groundwater zones within an esker aquifer for seasonal energy exchange. This case links well hydraulics and thermal transport with operational heating and cooling demand.

Ground-source energyDewatering and groundwaterSite investigation
Sutong Bridge during construction. The image shows the actual crossing; detailed shaft groups, pile-cap geometry and scour protection are described in the project engineering papers.

Sutong Bridge project authorities · 2008

Sutong Bridge — deep pile groups and riverbed scour protection

The main pylons use large groups of long drilled shafts in deep water and soft ground. Project papers connect testing, pile-group analysis, post-grouting, cofferdam construction and permanent scour protection.

Piles and drilled shaftsLateral foundations and interactionScour and erosion protection
The Osman Gazi Bridge across Izmit Bay. The buried and submerged foundation details are documented in the linked design and construction sources.

Gebze–Orhangazi–Izmir motorway project · 2016

Osman Gazi Bridge — seismic caissons on gravel beds

The suspension bridge combines offshore caisson foundations with improved ground and a gravel interface intended to accommodate extreme seismic movement. Published accounts describe soil–structure interaction and marine installation.

Lateral foundations and interactionEarthquakes and liquefactionGround improvement
Hywind Scotland photographed from the sea on 22 June 2022. The turbine spars are visible above the water; the suction anchors and mooring arrangements are described in the linked project records.

Equinor / Masdar · 2017

Hywind Scotland — suction anchors for floating wind

Five floating turbines use mooring systems connected to seabed suction anchors. Project and decommissioning material support an integrated study of anchor capacity, installation, inspection and eventual removal.

Coastal and offshore foundationsLateral foundations and interactionSite investigation
Yeager Airport photographed on 20 October 2026. This later site view is context for the 2015 reinforced-slope failure; it is not an image of the failure itself or a reconstruction drawing.

Central West Virginia Regional Airport Authority · 2015

Yeager Airport — reinforced-slope failure and degraded rock

The reinforced slope supporting a runway extension failed in 2015. Published investigations examine the fill–rock interface, material strength selection and global failure mechanisms, offering a strong forensic capstone.

Reinforced soil and geosyntheticsSoil slopes and landslidesRock slopes and foundations

From project evidence to a design study

Each case separates documented project decisions and available records from a suggested capstone exercise. Missing final designs, costs, schedules or completion records are identified. A teaching exercise may require additional assumptions, site investigation or instructor-supplied inputs.

Topic coverage

Projects may address several topics. Counts below represent relevant project records, not independent examples for every method.