Pebble Beach Drive — coastal bluff stabilization
An eroding coastal bluff was treated using launched fiberglass soil nails, facing and drainage under restricted site access.
Foundation Design · Cases
Documented projects, design decisions and lessons for engineering practice and capstone studies.
25 of 117 project case studies
An eroding coastal bluff was treated using launched fiberglass soil nails, facing and drainage under restricted site access.
Terminal ground treatment used vertical drains through variable soft deposits. Installation equipment recorded drain location and depth for quality control.
The navigation replacement became operational in 2018 after a long construction programme. USACE publishes project-control updates and completion material.
Repeat topographic and radar observations document the coastal landslide that destroyed part of Highway 1 in May 2017 and the continuing changes around its margins.
The five-turbine offshore project has public foundation-installation observations and subsequent structural-monitoring studies.
Flood damage and channel migration prompted comparison of replacement spans and erosion protection at the County Road 91 crossing.
Following Hurricane Michael, roadway reconstruction incorporated articulated concrete blocks over filter fabric and bedding to reduce recurring embankment erosion.
An offshore airport on deep marine deposits combines accelerated consolidation with ongoing settlement observation and adjustable building supports. The operator publishes measured island subsidence and its mitigation approach.
The bridge foundations combine large caissons, a gravel interface and steel inclusions in weak seabed deposits. The designer distinguishes this system from piles structurally connected to a raft.
The reclamation programme used prefabricated vertical drains to accelerate consolidation of marine clay. Its investigators publish pilot trials, specialized testing and interpretation of settlement and pore-pressure records.
A reclamation trial combined vacuum preloading and vertical drainage in soft dredged mud and underlying clay. A cutoff isolated permeable layers, while stability at the adjacent marine park constrained surcharge filling.
The artificial island’s reclaimed sand was treated by vibrocompaction before infrastructure construction. The project’s visitor centre explains the working sequence and its role in controlling settlement and liquefaction susceptibility.
Redevelopment of the former naval station must address liquefiable fill, compressible bay mud and perimeter stability. City documents connect geotechnical work with groundwater, contaminated-soil management and phased infrastructure delivery.
The barrier combines a long pile-supported wall with navigation gates and levee connections. The geotechnical consultant describes capacity, settlement, global stability and temporary-works analyses in soft coastal deposits.
The gate and pumping complex is founded in soft, compressible deltaic deposits. USACE authors describe exploration, laboratory characterization and pile testing used to develop design strength profiles.
The immersed crossing combined a gravel foundation, under-base grouting and treatment of liquefiable deposits. A project paper explains element connections and the transition to adjacent bored tunnels under severe seismic demands.
Artificial islands connect a long immersed crossing founded above variable soft deposits. Project papers describe composite foundation treatment, island formation and full-scale testing near transition zones.
Many caisson quay walls moved seaward during the 1995 earthquake. Port researchers studied the combined contributions of inertia and excess pore pressure beneath and behind the walls.
Contaminated harbour sediment is managed within a double-walled engineered containment facility. The owner separates wall construction, dredging and the later environmental cap and structural works.
Modernization studies used offshore investigation and a test-pile programme to examine drivability, capacity and underwater noise. The petroleum/cement terminal team also characterized cyclic behavior and soil–structure interaction.
The main pylons use large groups of long drilled shafts in deep water and soft ground. Project papers connect testing, pile-group analysis, post-grouting, cofferdam construction and permanent scour protection.
The suspension bridge combines offshore caisson foundations with improved ground and a gravel interface intended to accommodate extreme seismic movement. Published accounts describe soil–structure interaction and marine installation.
Five floating turbines use mooring systems connected to seabed suction anchors. Project and decommissioning material support an integrated study of anchor capacity, installation, inspection and eventual removal.
The movable barrier retains tidal exchange while closing during severe water levels. Its foundation and bed-protection concepts provide a case on erosion resistance, interface stability and long-term renewal of marine structures.
| Title | Type | Owner / location | Year | Access |
|---|---|---|---|---|
| Pebble Beach Drive — coastal bluff stabilization | Rehabilitation | Del Norte CountyCrescent City, California | 2009 | Study materials |
| Hugh K. Leatherman Terminal — vertical-drain installation control | Design and construction | South Carolina State Ports AuthorityCharleston, South Carolina | 2018 | Study materials |
| Olmsted Locks and Dam — marine construction and project controls | Design and construction | US Army Corps of EngineersOhio River, Illinois–Kentucky | 2018 | Study materials |
| Mud Creek, Highway 1 — landslide mapping and road recovery | Forensic investigation | Caltrans / USGS and NASA investigation partnersBig Sur, California | 2017 | Study materials |
| Block Island Wind Farm — pile foundations and measured stiffness | Design and construction | Deepwater Wind / project partnersOffshore Rhode Island | 2016 | Study materials |
| Beaver Dam Wash Bridge — scour-resistant replacement | Rehabilitation | Mohave County Public WorksMohave County, Arizona | 2005 | Original documents |
| US 98, Florida — coastal roadway revetment | Rehabilitation | Florida Department of TransportationFlorida Panhandle | 2018 | Original documents |
| Kansai International Airport — reclamation and long-term settlement | Design, construction and performance | Kansai AirportsOsaka Bay | 2025 | Study materials |
| Rion–Antirion Bridge — seismic caissons on improved seabed | Design, construction and performance | GefyraGulf of Corinth | 2004 | Study materials |
| Changi East reclamation — instrumented vertical-drain design | Design, construction and performance | Singapore reclamation authoritiesEastern Singapore | 2005 | Study materials |
| Port of Brisbane — vacuum consolidation beside a marine park | Design, construction and performance | Port of BrisbaneFisherman Islands, Queensland | 2009 | Study materials |
| Palm Jumeirah — densification of reclaimed sand | Design, construction and performance | NakheelDubai | 2006 | Study materials |
| Treasure Island redevelopment — liquefaction, settlement and shoreline stability | Design, construction and performance | Treasure Island Development Authority / TICDSan Francisco Bay | 2023 | Study materials |
| Lake Borgne surge barrier — pile-supported flood protection | Design, construction and performance | Flood Protection Authority East / USACENew Orleans, Louisiana | 2013 | Study materials |
| West Closure Complex — foundations on soft deltaic deposits | Design, construction and performance | US Army Corps of EngineersNew Orleans, Louisiana | 2011 | Study materials |
| Marmaray crossing — immersed-tunnel foundations in seismic ground | Design, construction and performance | Republic of Türkiye transport authoritiesBosphorus, Istanbul | 2013 | Study materials |
| Hong Kong–Zhuhai–Macao crossing — immersed-tunnel settlement transitions | Design, construction and performance | Hong Kong–Zhuhai–Macao Bridge AuthorityPearl River estuary | 2018 | Study materials |
| Kobe Port — quay-wall displacement during liquefaction | Design, construction and performance | Port of Kobe / Japanese port researchersKobe | 1995 | Study materials |
| Randle Reef — harbour sediment containment and final capping | Design, construction and performance | Canada Water Agency and project partnersHamilton Harbour, Ontario | 2026 | Study materials |
| Port of Alaska — test piles and seismic waterfront foundations | Design, construction and performance | Don Young Port of AlaskaAnchorage, Alaska | 2020 | Study materials |
| Sutong Bridge — deep pile groups and riverbed scour protection | Design, construction and performance | Sutong Bridge project authoritiesYangtze River, Jiangsu | 2008 | Study materials |
| Osman Gazi Bridge — seismic caissons on gravel beds | Design, construction and performance | Gebze–Orhangazi–Izmir motorway projectIzmit Bay | 2016 | Study materials |
| Hywind Scotland — suction anchors for floating wind | Design, construction and performance | Equinor / MasdarBuchan Deep, offshore Peterhead | 2017 | Study materials |
| Eastern Scheldt Barrier — foundation mats and scour resilience | Design, construction and performance | RijkswaterstaatZeeland | 1986 | Study materials |
Each case separates documented project decisions and available records from a suggested capstone exercise. Missing final designs, costs, schedules or completion records are identified. A teaching exercise may require additional assumptions, site investigation or instructor-supplied inputs.
Projects may address several topics. Counts below represent relevant project records, not independent examples for every method.