I-15 reconstruction — soft-ground embankments and geofoam
Rapid highway reconstruction over soft lacustrine soils used geofoam, lime-cement columns, vertical drains, surcharge and staged MSE construction. UDOT reports ten-year performance.
Foundation Design · Cases
Documented projects, design decisions and lessons for engineering practice and capstone studies.
35 of 117 project case studies
Rapid highway reconstruction over soft lacustrine soils used geofoam, lime-cement columns, vertical drains, surcharge and staged MSE construction. UDOT reports ten-year performance.
UDOT used geofoam blocks for the ramp connecting West Davis Highway to southbound I-15, with existing transport infrastructure constraining allowable settlement.
A highway embankment over organic clay used vertical drains, surcharge and staged filling, with remote monitoring of pore pressure and settlement.
Terminal ground treatment used vertical drains through variable soft deposits. Installation equipment recorded drain location and depth for quality control.
A distribution-centre site on former strip-mine ground combined dynamic compaction with aggregate piers where wet, weak areas did not respond adequately.
The submitted case describes dynamic compaction of variable former landfill material before shallow foundations and slabs were constructed.
A hangar expansion used dynamic compaction to reduce liquefaction susceptibility in sandy fill and outwash, with vibration controls beside operating airport facilities.
The arena foundation study compared deep foundations with spread footings on improved ground. Test sections supported the selected compaction and replacement approach.
Project research documents deep mixing in marine clay at Bird Island Flats and Fort Point Channel and the control of excavation-induced movements.
Project-authored learning-legacy papers describe settlement mitigation and monitoring around Farringdon, including the response of Lindsey Street Bridge.
A deep concrete barrier and associated grouting addressed seepage through the dam’s karst foundation. USACE documents completion and project scope.
A staged rehabilitation treated foundation seepage and auxiliary-dam risks using grouting, a deep cutoff wall and a roller-compacted-concrete berm.
The rehabilitation combined cutoff walls, culvert replacements and embankment armoring around Lake Okeechobee. USACE provides a completion summary and project update.
The 2012 trials compared shallow rafts, mixing columns, a perimeter curtain and densification approaches to support residential foundation repair and rebuilding.
An offshore airport on deep marine deposits combines accelerated consolidation with ongoing settlement observation and adjustable building supports. The operator publishes measured island subsidence and its mitigation approach.
The bridge foundations combine large caissons, a gravel interface and steel inclusions in weak seabed deposits. The designer distinguishes this system from piles structurally connected to a raft.
The original airport terminal crosses former island rock and newly reclaimed ground. The designer describes a range of foundation types adapted to these contrasting conditions; a contemporaneous paper documents vibrocompaction of marine sand fill.
The reclamation programme used prefabricated vertical drains to accelerate consolidation of marine clay. Its investigators publish pilot trials, specialized testing and interpretation of settlement and pore-pressure records.
A reclamation trial combined vacuum preloading and vertical drainage in soft dredged mud and underlying clay. A cutoff isolated permeable layers, while stability at the adjacent marine park constrained surcharge filling.
The artificial island’s reclaimed sand was treated by vibrocompaction before infrastructure construction. The project’s visitor centre explains the working sequence and its role in controlling settlement and liquefaction susceptibility.
Redevelopment of the former naval station must address liquefiable fill, compressible bay mud and perimeter stability. City documents connect geotechnical work with groundwater, contaminated-soil management and phased infrastructure delivery.
The transit-center excavation required a stiff, low-permeability perimeter and protection of nearby foundations. Public authority records explain proposed test shafts, soil improvement and groundwater concerns during design.
The excavation engineer describes a staged support system using deep soil-mixed soldier walls, internal bracing, jet-grouted shafts, a secant-pile ring and tiebacks. Artesian pressure and nearby structures governed key design checks.
A dam-repair programme installed a cutoff wall to reduce foundation seepage. USACE reports the contract and return toward normal operations; the technical literature discusses wall verification drilling.
| Title | Type | Owner / location | Year | Access |
|---|---|---|---|---|
| I-15 reconstruction — soft-ground embankments and geofoam | Design and construction | Utah Department of TransportationSalt Lake City, Utah | 2001 | Study materials |
| West Davis Highway ramp — lightweight fill beside live transport | Design and construction | Utah Department of TransportationFarmington, Utah | 2023 | Study materials |
| US 14 near Nicollet — preload and vertical drains | Design and construction | Minnesota Department of TransportationNicollet, Minnesota | 2016 | Study materials |
| Hugh K. Leatherman Terminal — vertical-drain installation control | Design and construction | South Carolina State Ports AuthorityCharleston, South Carolina | 2018 | Study materials |
| Olyphant distribution centre — variable mine-spoil improvement | Design and construction | D&L RealtyOlyphant, Pennsylvania | 2022 | Study materials |
| Tempe Marketplace — foundations over former landfill | Redevelopment | Owner not stated in reviewed caseTempe, Arizona | 2015 | Study materials |
| JFK hangar expansion — liquefaction mitigation by compaction | Design and construction | Airport project owner not stated in reviewed caseQueens, New York | 1999 | Study materials |
| Prudential Center — shallow foundations after improvement | Redevelopment | New Jersey DevilsNewark, New Jersey | 2006 | Study materials |
| Boston Central Artery/Tunnel — deep mixing and ground movement | Design and construction | Massachusetts highway agenciesBoston, Massachusetts | 2006 | Study materials |
| Crossrail Farringdon — compensation grouting near existing assets | Design and construction | CrossrailLondon, England | 2016 | Study materials |
| Wolf Creek Dam — karst-foundation cutoff wall | Rehabilitation | US Army Corps of EngineersJamestown, Kentucky | 2013 | Study materials |
| Center Hill Dam — grouting, cutoff wall and stabilizing berm | Rehabilitation | US Army Corps of EngineersDeKalb County, Tennessee | 2020 | Study materials |
| Herbert Hoover Dike — seepage barriers and structure replacement | Rehabilitation | US Army Corps of EngineersLake Okeechobee, Florida | 2023 | Original documents |
| Canterbury residential ground-improvement trials | Field demonstration | New Zealand building ministry and trial partnersChristchurch, Canterbury | 2012 | Study materials |
| Kansai International Airport — reclamation and long-term settlement | Design, construction and performance | Kansai AirportsOsaka Bay | 2025 | Study materials |
| Rion–Antirion Bridge — seismic caissons on improved seabed | Design, construction and performance | GefyraGulf of Corinth | 2004 | Study materials |
| Hong Kong International Airport — foundations across rock and reclamation | Design, construction and performance | Airport Authority Hong KongChek Lap Kok | 1998 | Study materials |
| Changi East reclamation — instrumented vertical-drain design | Design, construction and performance | Singapore reclamation authoritiesEastern Singapore | 2005 | Study materials |
| Port of Brisbane — vacuum consolidation beside a marine park | Design, construction and performance | Port of BrisbaneFisherman Islands, Queensland | 2009 | Study materials |
| Palm Jumeirah — densification of reclaimed sand | Design, construction and performance | NakheelDubai | 2006 | Study materials |
| Treasure Island redevelopment — liquefaction, settlement and shoreline stability | Design, construction and performance | Treasure Island Development Authority / TICDSan Francisco Bay | 2023 | Study materials |
| Transbay Transit Center — deep excavation beside existing foundations | Design, construction and performance | Transbay Joint Powers AuthoritySan Francisco | 2010 | Study materials |
| Salesforce Tower — staged excavation and artesian-pressure control | Design, construction and performance | Salesforce Tower development teamSan Francisco | 2018 | Study materials |
| East Branch Dam — cutoff-wall construction and verification | Design, construction and performance | US Army Corps of EngineersElk County, Pennsylvania | 2020 | Study materials |
Each case separates documented project decisions and available records from a suggested capstone exercise. Missing final designs, costs, schedules or completion records are identified. A teaching exercise may require additional assumptions, site investigation or instructor-supplied inputs.
Projects may address several topics. Counts below represent relevant project records, not independent examples for every method.