Burj Khalifa in Dubai.

Emaar Properties · 2010

Burj Khalifa — piled-raft settlement design

The tower uses a piled raft in weak sedimentary rock. The foundation designer publishes an analysis process linking ground characterization, trial pile testing and settlement predictions for super-tall towers.

Piles and drilled shaftsShallow foundationsSettlement and consolidation
Construction of the Marina Bay Sands resort in Singapore.

Marina Bay Sands · 2010

Marina Bay Sands — deep foundations on reclaimed ground

The integrated resort was constructed on reclaimed waterfront land. The foundation contractors describe bored piling and advance removal of a buried seawall within a tightly constrained site.

Piles and drilled shaftsExcavation supportDewatering and groundwater
The Millau Viaduct during construction.

Compagnie Eiffage du Viaduc de Millau · 2004

Millau Viaduct — rock foundations and observational control

Very tall bridge piers transfer load through large shaft-and-raft foundations in limestone and marl. The geotechnical authors report measured foundation movement and the observational design strategy.

Rock slopes and foundationsPiles and drilled shaftsSettlement and consolidation
Historical aerial photograph of the enclosed Changi East slurry pond before reclamation.

Singapore reclamation authorities · 2005

Changi East reclamation — instrumented vertical-drain design

The reclamation programme used prefabricated vertical drains to accelerate consolidation of marine clay. Its investigators publish pilot trials, specialized testing and interpretation of settlement and pore-pressure records.

Settlement and consolidationGround improvementLaboratory testing and parameters
Aerial view of the Port of Brisbane and adjoining airport in 2015.

Port of Brisbane · 2009

Port of Brisbane — vacuum consolidation beside a marine park

A reclamation trial combined vacuum preloading and vertical drainage in soft dredged mud and underlying clay. A cutoff isolated permeable layers, while stability at the adjacent marine park constrained surcharge filling.

Ground improvementSettlement and consolidationSeepage and internal erosion
Palm Jumeirah viewed from a helicopter in May 2008.

Nakheel · 2006

Palm Jumeirah — densification of reclaimed sand

The artificial island’s reclaimed sand was treated by vibrocompaction before infrastructure construction. The project’s visitor centre explains the working sequence and its role in controlling settlement and liquefaction susceptibility.

Ground improvementCoastal and offshore foundationsEarthquakes and liquefaction
Salesforce Tower during construction in San Francisco.

Salesforce Tower development team · 2018

Salesforce Tower — staged excavation and artesian-pressure control

The excavation engineer describes a staged support system using deep soil-mixed soldier walls, internal bracing, jet-grouted shafts, a secant-pile ring and tiebacks. Artesian pressure and nearby structures governed key design checks.

Excavation supportDewatering and groundwaterGround improvement
Aerial view of the raised San Vicente Dam and reservoir in San Diego County.

San Diego County Water Authority · 2014

San Vicente Dam raise — rock preparation and RCC interface

The existing concrete dam was raised using roller-compacted concrete. Owner documents connect excavation to competent rock, treatment of localized poor material and seepage control with the enlarged structure.

Rock slopes and foundationsDams and leveesSeepage and internal erosion
Aerial view of Calaveras Reservoir during reconstruction of the dam.

San Francisco Public Utilities Commission · 2019

Calaveras Dam replacement — seismic foundations and unexpected landslides

Replacement of a seismically vulnerable dam encountered an additional ancient landslide during abutment excavation. Public environmental and budget records document supplemental investigation, design revisions and delivery consequences.

Dams and leveesEarthquakes and liquefactionSoil slopes and landslides
Aerial view of the Isabella Dam Safety Modification Project on 14 September 2022.

US Army Corps of Engineers · 2023

Isabella Dam modifications — seismic, seepage and spillway risk

The main and auxiliary dams were modified to address combined seismic, seepage and flood-passage concerns. Owner records describe dam raises, downstream buttress work, filters, drainage and major spillway excavation.

Dams and leveesSeepage and internal erosionEarthquakes and liquefaction
East Branch Clarion River Lake and Dam near Wilcox, Pennsylvania.

US Army Corps of Engineers · 2020

East Branch Dam — cutoff-wall construction and verification

A dam-repair programme installed a cutoff wall to reduce foundation seepage. USACE reports the contract and return toward normal operations; the technical literature discusses wall verification drilling.

Dams and leveesSeepage and internal erosionGround improvement
Aerial view of construction equipment along the crest of Clearwater Lake Dam in Missouri.

US Army Corps of Engineers · 2011

Clearwater Dam — karst pretreatment and a hanging cutoff

A sinkhole prompted foundation exploration and grouting before construction of a deep seepage cutoff. The owner explains why treating solution-enlarged fractures was necessary for slurry-supported excavation.

Dams and leveesSeepage and internal erosionRock slopes and foundations
Seepage east of and below the Mosul Dam spillway.

Iraq Ministry of Water Resources · 2019

Mosul Dam — maintenance grouting in soluble foundations

The dam overlies soluble limestone and gypsum. A rehabilitation programme strengthened maintenance grouting, equipment and instrumentation; continuing operation depends on sustained foundation management.

Dams and leveesSeepage and internal erosionRock slopes and foundations
Glen Canyon Dam under construction in 1962.

US Bureau of Reclamation · 1966

Glen Canyon Dam — sandstone abutments and controlled seepage

The high concrete dam required canyon-wall stabilization, river diversion and excavation to sandstone bedrock. Reclamation describes rock bolts, seepage measurement and the geological basis of the site selection.

Rock slopes and foundationsDams and leveesSeepage and internal erosion
Aerial view of construction at the IHNC–Lake Borgne Surge Barrier in eastern New Orleans.

Flood Protection Authority East / USACE · 2013

Lake Borgne surge barrier — pile-supported flood protection

The barrier combines a long pile-supported wall with navigation gates and levee connections. The geotechnical consultant describes capacity, settlement, global stability and temporary-works analyses in soft coastal deposits.

Piles and drilled shaftsLateral foundations and interactionCoastal and offshore foundations

From project evidence to a design study

Each case separates documented project decisions and available records from a suggested capstone exercise. Missing final designs, costs, schedules or completion records are identified. A teaching exercise may require additional assumptions, site investigation or instructor-supplied inputs.

Topic coverage

Projects may address several topics. Counts below represent relevant project records, not independent examples for every method.