Pebble Beach Drive — coastal bluff stabilization
An eroding coastal bluff was treated using launched fiberglass soil nails, facing and drainage under restricted site access.
Foundation Design · Cases
Documented projects, design decisions and lessons for engineering practice and capstone studies.
25 of 117 project case studies
An eroding coastal bluff was treated using launched fiberglass soil nails, facing and drainage under restricted site access.
A deep concrete barrier and associated grouting addressed seepage through the dam’s karst foundation. USACE documents completion and project scope.
A staged rehabilitation treated foundation seepage and auxiliary-dam risks using grouting, a deep cutoff wall and a roller-compacted-concrete berm.
The rehabilitation combined cutoff walls, culvert replacements and embankment armoring around Lake Okeechobee. USACE provides a completion summary and project update.
Recovery rebuilt the main spillway and added a secant pile wall, splashpad and buttress at the emergency spillway after the 2017 incident.
The first-filling failure is documented through the Bureau of Reclamation’s history and the independent investigation report.
Post-Katrina investigations and reevaluation examine the canal floodwall/levee system, including the soil profile and interaction between the wall and foundation.
Long-term monitoring examines an evapotranspiration-capillary barrier intended to limit infiltration into waste. The annual report also discusses side-slope edge effects.
A reclamation trial combined vacuum preloading and vertical drainage in soft dredged mud and underlying clay. A cutoff isolated permeable layers, while stability at the adjacent marine park constrained surcharge filling.
The existing concrete dam was raised using roller-compacted concrete. Owner documents connect excavation to competent rock, treatment of localized poor material and seepage control with the enlarged structure.
The main and auxiliary dams were modified to address combined seismic, seepage and flood-passage concerns. Owner records describe dam raises, downstream buttress work, filters, drainage and major spillway excavation.
A dam-repair programme installed a cutoff wall to reduce foundation seepage. USACE reports the contract and return toward normal operations; the technical literature discusses wall verification drilling.
A sinkhole prompted foundation exploration and grouting before construction of a deep seepage cutoff. The owner explains why treating solution-enlarged fractures was necessary for slurry-supported excavation.
The dam overlies soluble limestone and gypsum. A rehabilitation programme strengthened maintenance grouting, equipment and instrumentation; continuing operation depends on sustained foundation management.
Construction removed river deposits to competent rock and treated the foundation and abutments. Later drainage and remedial grouting addressed uplift and leakage observed during initial reservoir filling.
The high concrete dam required canyon-wall stabilization, river diversion and excavation to sandstone bedrock. Reclamation describes rock bolts, seepage measurement and the geological basis of the site selection.
Rehabilitation combined a partial-depth barrier, blanket improvements, relief wells and an abutment grout curtain. The project authors explain construction problems in thin limestone units with open flow paths.
The barrier combines a long pile-supported wall with navigation gates and levee connections. The geotechnical consultant describes capacity, settlement, global stability and temporary-works analyses in soft coastal deposits.
The reservoir disaster involved a large pre-existing rockslide and rapid displacement of reservoir water. Geological researchers emphasize the complex shear zone and the influence of groundwater and reservoir operations.
The arch dam failed after instability developed in its rock foundation. The French dam committee and government accident record describe the role of discontinuity geometry, uplift and stress-dependent drainage.
The remedy contains waste beneath a cap and intercepts contaminated groundwater for treatment. EPA records describe the expanded synthetic cover, barrier drains and continuing inspection programme.
Rehabilitated waste areas form parkland above engineered containment. The authority describes the continuing management of landfills and a wetland-based system for treating collected leachate.
The Seed Vault upgrade replaced its access tunnel with a watertight concrete structure and moved heat-producing services. The construction account includes artificial ground freezing to support the replacement works.
The remediated site retains engineered landfill covers, groundwater collection/treatment systems and long-term inspections. Public surveillance records support a capstone on containment performance after closure.
| Title | Type | Owner / location | Year | Access |
|---|---|---|---|---|
| Pebble Beach Drive — coastal bluff stabilization | Rehabilitation | Del Norte CountyCrescent City, California | 2009 | Study materials |
| Wolf Creek Dam — karst-foundation cutoff wall | Rehabilitation | US Army Corps of EngineersJamestown, Kentucky | 2013 | Study materials |
| Center Hill Dam — grouting, cutoff wall and stabilizing berm | Rehabilitation | US Army Corps of EngineersDeKalb County, Tennessee | 2020 | Study materials |
| Herbert Hoover Dike — seepage barriers and structure replacement | Rehabilitation | US Army Corps of EngineersLake Okeechobee, Florida | 2023 | Original documents |
| Oroville spillway recovery — erosion-resistant foundation reconstruction | Rehabilitation | California Department of Water ResourcesOroville, California | 2018 | Study materials |
| Teton Dam — internal erosion and first-filling investigation | Forensic investigation | US Bureau of ReclamationEastern Idaho | 1976 | Study materials |
| 17th Street Canal — floodwall failure and reevaluation | Forensic investigation | US Army Corps of EngineersNew Orleans, Louisiana | 2005 | Study materials |
| Prototype Hanford Barrier — long-term infiltration control | Field demonstration | US Department of Energy / PNNLHanford Site, Washington | 2024 | Study materials |
| Port of Brisbane — vacuum consolidation beside a marine park | Design, construction and performance | Port of BrisbaneFisherman Islands, Queensland | 2009 | Study materials |
| San Vicente Dam raise — rock preparation and RCC interface | Design, construction and performance | San Diego County Water AuthoritySan Diego County, California | 2014 | Study materials |
| Isabella Dam modifications — seismic, seepage and spillway risk | Design, construction and performance | US Army Corps of EngineersKern County, California | 2023 | Study materials |
| East Branch Dam — cutoff-wall construction and verification | Design, construction and performance | US Army Corps of EngineersElk County, Pennsylvania | 2020 | Study materials |
| Clearwater Dam — karst pretreatment and a hanging cutoff | Design, construction and performance | US Army Corps of EngineersWayne and Reynolds counties, Missouri | 2011 | Study materials |
| Mosul Dam — maintenance grouting in soluble foundations | Design, construction and performance | Iraq Ministry of Water ResourcesTigris River, northern Iraq | 2019 | Study materials |
| Hoover Dam — rock-foundation preparation and remedial grouting | Design, construction and performance | US Bureau of ReclamationColorado River, Nevada–Arizona | 1947 | Study materials |
| Glen Canyon Dam — sandstone abutments and controlled seepage | Design, construction and performance | US Bureau of ReclamationPage, Arizona | 1966 | Study materials |
| Bolivar Dam — seepage barriers in outwash and fractured abutment rock | Design, construction and performance | US Army Corps of EngineersTuscarawas County, Ohio | 2017 | Study materials |
| Lake Borgne surge barrier — pile-supported flood protection | Design, construction and performance | Flood Protection Authority East / USACENew Orleans, Louisiana | 2013 | Study materials |
| Vajont reservoir — rockslide, groundwater and observational decisions | Failure investigation and lessons | Historic reservoir project / Italian public investigationVajont Valley | 1963 | Study materials |
| Malpasset Dam — abutment wedge failure and uplift | Failure investigation and lessons | Historic Malpasset water-supply projectFréjus | 1959 | Study materials |
| Love Canal — containment cap and barrier drainage | Design, construction and performance | US EPA / New York State Department of Environmental ConservationNiagara Falls, New York | 1985 | Study materials |
| Sydney Olympic Park — engineered waste mounds and leachate management | Design, construction and performance | Sydney Olympic Park AuthorityHomebush Bay, New South Wales | 2022 | Study materials |
| Svalbard Seed Vault — tunnel waterproofing and frozen ground | Design, construction and performance | Norwegian Ministry of Agriculture and Food / StatsbyggLongyearbyen, Svalbard | 2019 | Study materials |
| Rocky Flats — engineered covers and long-term groundwater care | Design, construction and performance | U.S. Department of Energy, Office of Legacy ManagementColorado Front Range | 2026 | Original documents |
Each case separates documented project decisions and available records from a suggested capstone exercise. Missing final designs, costs, schedules or completion records are identified. A teaching exercise may require additional assumptions, site investigation or instructor-supplied inputs.
Projects may address several topics. Counts below represent relevant project records, not independent examples for every method.