Foundation Design · Cases

Find Engineering Cases

Documented projects, design decisions and lessons for engineering practice and capstone studies.

Owner, location & access
Clear filters

60 of 117 project case studies

The completed Founders/Meadows Bridge and its reinforced-soil approaches, viewed from the southwest. Original project photograph in Report 1, Figure B-3.

Colorado Department of Transportation · 1999

Founders/Meadows Bridge — footings on reinforced soil

The bridge and approach roadway were supported on geosynthetic-reinforced segmental walls. A material-testing and instrumentation programme followed the experimental arrangement.

Reinforced soil and geosyntheticsShallow foundationsLaboratory testing and parameters
The 100 South utility corridor during the Salt Lake City I-15 reconstruction, shown in the project authors’ Figure 2.

Utah Department of Transportation · 2001

I-15 reconstruction — soft-ground embankments and geofoam

Rapid highway reconstruction over soft lacustrine soils used geofoam, lime-cement columns, vertical drains, surcharge and staged MSE construction. UDOT reports ten-year performance.

Settlement and consolidationGround improvementReinforced soil and geosynthetics
Microcamera photograph of defective concrete inside a Route 288 drilled shaft, from the project evaluation paper’s Figure 9. This is the actual shaft inspection, rather than an exterior bridge view.

Virginia Department of Transportation · 2004

Virginia Route 288 — drilled-shaft quality evaluation

This design-build highway case documents drilled-shaft assessment using crosshole sonic logging and pile-integrity tests, including construction anomalies.

Piles and drilled shaftsSite investigationMonitoring and observational design
Production micropiles installed under limited headroom at one of the New Jersey Turnpike bridge retrofits. Original Figure 3 from the project authors’ 2008 paper.

New Jersey highway agencies; see source · 2008

New Jersey Turnpike bridges — micropile underpinning

Four bridge retrofits used hollow-core bar micropiles under limited headroom after deterioration of exposed precast piles. The submitted case includes proof and verification tests.

Piles and drilled shaftsScour and erosion protectionMonitoring and observational design
Aerial photograph of the completed soil-nailed walls along River Road in Pima County, Arizona. The original Google attribution remains in the image.

Pima County Department of Transportation · 2004

River Road, Tucson — tall soil-nailed cuts

Road widening beneath developed bluffs used tall soil-nailed walls. Loose seams and constrained investigation access required construction responses.

Retaining walls and anchorsExcavation supportSite investigation
Vertical-drain construction on the US 14 embankment project near Nicollet, Minnesota.

Minnesota Department of Transportation · 2016

US 14 near Nicollet — preload and vertical drains

A highway embankment over organic clay used vertical drains, surcharge and staged filling, with remote monitoring of pore pressure and settlement.

Settlement and consolidationGround improvementExpansive, collapsible and organic soils
The Mud Creek landslide on California’s Big Sur coast in May 2017.

Caltrans / USGS and NASA investigation partners · 2017

Mud Creek, Highway 1 — landslide mapping and road recovery

Repeat topographic and radar observations document the coastal landslide that destroyed part of Highway 1 in May 2017 and the continuing changes around its margins.

Soil slopes and landslidesCoastal and offshore foundationsMonitoring and observational design
Annotated aerial photograph of the completed Prototype Hanford Barrier in August 1994.

US Department of Energy / PNNL · 2024

Prototype Hanford Barrier — long-term infiltration control

Long-term monitoring examines an evapotranspiration-capillary barrier intended to limit infiltration into waste. The annual report also discusses side-slope edge effects.

Contaminated ground and waste barriersSeepage and internal erosionMonitoring and observational design
The completed US 231 bridges at Lacey Springs span the unstable slope, shown in the FHWA case study’s Figure 3.

Alabama Department of Transportation · 2020

US 231, Lacey Springs — bridging a moving landslide

After a rainfall-triggered slide, ALDOT selected two bridges across the unstable area rather than reconstructing the road on the moving embankment.

Soil slopes and landslidesPiles and drilled shaftsLateral foundations and interaction
The Leaning Tower of Pisa after the stabilization works.

Italian Government / Opera della Primaziale Pisana · 2008

Leaning Tower of Pisa — controlled underexcavation

A heritage foundation was stabilized by carefully removing soil beneath its north side. Published post-intervention observations connect rotation, settlement and groundwater control.

Shallow foundationsSettlement and consolidationDewatering and groundwater

From project evidence to a design study

Each case separates documented project decisions and available records from a suggested capstone exercise. Missing final designs, costs, schedules or completion records are identified. A teaching exercise may require additional assumptions, site investigation or instructor-supplied inputs.

Topic coverage

Projects may address several topics. Counts below represent relevant project records, not independent examples for every method.