Founders/Meadows Bridge — footings on reinforced soil
The bridge and approach roadway were supported on geosynthetic-reinforced segmental walls. A material-testing and instrumentation programme followed the experimental arrangement.
Foundation Design · Cases
Documented projects, design decisions and lessons for engineering practice and capstone studies.
60 of 117 project case studies
The bridge and approach roadway were supported on geosynthetic-reinforced segmental walls. A material-testing and instrumentation programme followed the experimental arrangement.
Rapid highway reconstruction over soft lacustrine soils used geofoam, lime-cement columns, vertical drains, surcharge and staged MSE construction. UDOT reports ten-year performance.
This design-build highway case documents drilled-shaft assessment using crosshole sonic logging and pile-integrity tests, including construction anomalies.
Four bridge retrofits used hollow-core bar micropiles under limited headroom after deterioration of exposed precast piles. The submitted case includes proof and verification tests.
A moving highway slope was stabilized using three reticulated micropile walls and ground anchors, allowing work under restricted access while maintaining traffic.
Road widening beneath developed bluffs used tall soil-nailed walls. Loose seams and constrained investigation access required construction responses.
A highway embankment over organic clay used vertical drains, surcharge and staged filling, with remote monitoring of pore pressure and settlement.
Terminal ground treatment used vertical drains through variable soft deposits. Installation equipment recorded drain location and depth for quality control.
The submitted case describes dynamic compaction of variable former landfill material before shallow foundations and slabs were constructed.
A hangar expansion used dynamic compaction to reduce liquefaction susceptibility in sandy fill and outwash, with vibration controls beside operating airport facilities.
Project research documents deep mixing in marine clay at Bird Island Flats and Fort Point Channel and the control of excavation-induced movements.
The bored-tunnel replacement passed beneath downtown Seattle. Owner material includes geology/soils assessment, procurement information and completion history.
Project-authored learning-legacy papers describe settlement mitigation and monitoring around Farringdon, including the response of Lindsey Street Bridge.
The rehabilitation combined cutoff walls, culvert replacements and embankment armoring around Lake Okeechobee. USACE provides a completion summary and project update.
USGS reports characterize the deposits and soils associated with the 2014 landslide, providing a basis for ground-model and hazard-assessment exercises.
Repeat topographic and radar observations document the coastal landslide that destroyed part of Highway 1 in May 2017 and the continuing changes around its margins.
Reservoir drawdown, dam removal and sediment excavation/capping were coordinated with river restoration and replacement of affected water-supply wells.
Long-term monitoring examines an evapotranspiration-capillary barrier intended to limit infiltration into waste. The annual report also discusses side-slope edge effects.
The highway used fill placement and separation geotextile to protect permafrost, with much construction undertaken in winter.
Twelve embankment test sections compared air-convection shoulder geometry and rock classes over thaw-unstable permafrost near milepost 219.
The five-turbine offshore project has public foundation-installation observations and subsequent structural-monitoring studies.
The NTSB investigation documents the bridge collapse after scour undermined spread-footing support, including construction, protection and inspection issues.
After a rainfall-triggered slide, ALDOT selected two bridges across the unstable area rather than reconstructing the road on the moving embankment.
A heritage foundation was stabilized by carefully removing soil beneath its north side. Published post-intervention observations connect rotation, settlement and groundwater control.
| Title | Type | Owner / location | Year | Access |
|---|---|---|---|---|
| Founders/Meadows Bridge — footings on reinforced soil | Design and construction | Colorado Department of TransportationCastle Rock, Colorado | 1999 | Study materials |
| I-15 reconstruction — soft-ground embankments and geofoam | Design and construction | Utah Department of TransportationSalt Lake City, Utah | 2001 | Study materials |
| Virginia Route 288 — drilled-shaft quality evaluation | Construction quality and testing | Virginia Department of TransportationRichmond region, Virginia | 2004 | Study materials |
| New Jersey Turnpike bridges — micropile underpinning | Rehabilitation | New Jersey highway agencies; see sourceNew Jersey | 2008 | Study materials |
| US 26/89, Snake River Canyon — micropile slope stabilization | Rehabilitation | Wyoming Department of TransportationWyoming | 1997 | Study materials |
| River Road, Tucson — tall soil-nailed cuts | Design and construction | Pima County Department of TransportationPima County, Arizona | 2004 | Study materials |
| US 14 near Nicollet — preload and vertical drains | Design and construction | Minnesota Department of TransportationNicollet, Minnesota | 2016 | Study materials |
| Hugh K. Leatherman Terminal — vertical-drain installation control | Design and construction | South Carolina State Ports AuthorityCharleston, South Carolina | 2018 | Study materials |
| Tempe Marketplace — foundations over former landfill | Redevelopment | Owner not stated in reviewed caseTempe, Arizona | 2015 | Study materials |
| JFK hangar expansion — liquefaction mitigation by compaction | Design and construction | Airport project owner not stated in reviewed caseQueens, New York | 1999 | Study materials |
| Boston Central Artery/Tunnel — deep mixing and ground movement | Design and construction | Massachusetts highway agenciesBoston, Massachusetts | 2006 | Study materials |
| Seattle SR 99 tunnel — soft-ground tunnelling and settlement | Design and construction | Washington State Department of TransportationSeattle, Washington | 2019 | Study materials |
| Crossrail Farringdon — compensation grouting near existing assets | Design and construction | CrossrailLondon, England | 2016 | Study materials |
| Herbert Hoover Dike — seepage barriers and structure replacement | Rehabilitation | US Army Corps of EngineersLake Okeechobee, Florida | 2023 | Original documents |
| Oso SR 530 landslide — investigation and mitigation planning | Forensic investigation | USGS investigation with university and state partnersSnohomish County, Washington | 2014 | Study materials |
| Mud Creek, Highway 1 — landslide mapping and road recovery | Forensic investigation | Caltrans / USGS and NASA investigation partnersBig Sur, California | 2017 | Study materials |
| Milltown Reservoir — dam removal and contaminated sediment remediation | Remediation and restoration | US EPA / Montana and responsible-party partnersMissoula County, Montana | 2009 | Study materials |
| Prototype Hanford Barrier — long-term infiltration control | Field demonstration | US Department of Energy / PNNLHanford Site, Washington | 2024 | Study materials |
| Inuvik–Tuktoyaktuk Highway — embankment over permafrost | Design and construction | Government of the Northwest TerritoriesNorthwest Territories | 2017 | Study materials |
| Dalton Highway MP 209–222 — air-convection embankment trial | Field demonstration | Alaska Department of Transportation and Public FacilitiesAlaska | 2022 | Study materials |
| Block Island Wind Farm — pile foundations and measured stiffness | Design and construction | Deepwater Wind / project partnersOffshore Rhode Island | 2016 | Study materials |
| Schoharie Creek Bridge — scour and foundation inspection | Forensic investigation | New York State Thruway AuthorityNear Amsterdam, New York | 1987 | Original documents |
| US 231, Lacey Springs — bridging a moving landslide | Rehabilitation | Alabama Department of TransportationLacey Springs, Alabama | 2020 | Original documents |
| Leaning Tower of Pisa — controlled underexcavation | Design, construction and performance | Italian Government / Opera della Primaziale PisanaPisa | 2008 | Study materials |
Each case separates documented project decisions and available records from a suggested capstone exercise. Missing final designs, costs, schedules or completion records are identified. A teaching exercise may require additional assumptions, site investigation or instructor-supplied inputs.
Projects may address several topics. Counts below represent relevant project records, not independent examples for every method.