Teton Dam — internal erosion and first-filling investigation
The first-filling failure is documented through the Bureau of Reclamation’s history and the independent investigation report.
Foundation Design · Cases
Documented projects, design decisions and lessons for engineering practice and capstone studies.
117 of 117 project case studies
The first-filling failure is documented through the Bureau of Reclamation’s history and the independent investigation report.
The navigation replacement became operational in 2018 after a long construction programme. USACE publishes project-control updates and completion material.
USGS reports characterize the deposits and soils associated with the 2014 landslide, providing a basis for ground-model and hazard-assessment exercises.
Repeat topographic and radar observations document the coastal landslide that destroyed part of Highway 1 in May 2017 and the continuing changes around its margins.
After the 2020 fire, CDOT compared rockfall mitigation using risk and benefit-cost analysis. Subsequent debris flows exceeded some installed protection capacities.
Rockslides near Ocoee Dam 2 required rock removal, bolting and stabilization while weather and difficult access affected the reopening programme.
Post-Katrina investigations and reevaluation examine the canal floodwall/levee system, including the soil profile and interaction between the wall and foundation.
The upstream embankment slide during the 1971 earthquake became a major case for evaluating liquefaction, residual strength and post-shaking stability.
The 2012 trials compared shallow rafts, mixing columns, a perimeter curtain and densification approaches to support residential foundation repair and rebuilding.
Reservoir drawdown, dam removal and sediment excavation/capping were coordinated with river restoration and replacement of affected water-supply wells.
Long-term monitoring examines an evapotranspiration-capillary barrier intended to limit infiltration into waste. The annual report also discusses side-slope edge effects.
The campus system uses closed-loop borefields to exchange heat with the ground. University material describes the two-field arrangement and staged conversion.
The highway used fill placement and separation geotextile to protect permafrost, with much construction undertaken in winter.
Twelve embankment test sections compared air-convection shoulder geometry and rock classes over thaw-unstable permafrost near milepost 219.
Field and laboratory work investigated heave of a relatively young pavement over compacted clay shale and distinguished wetting expansion from a suspected sulfate reaction.
A TxDOT-funded project investigated swelling clay beneath distressed pavement sections and evaluated characterization and stabilization alternatives.
The five-turbine offshore project has public foundation-installation observations and subsequent structural-monitoring studies.
The NTSB investigation documents the bridge collapse after scour undermined spread-footing support, including construction, protection and inspection issues.
After a rainfall-triggered slide, ALDOT selected two bridges across the unstable area rather than reconstructing the road on the moving embankment.
Flood damage and channel migration prompted comparison of replacement spans and erosion protection at the County Road 91 crossing.
Following Hurricane Michael, roadway reconstruction incorporated articulated concrete blocks over filter fabric and bedding to reduce recurring embankment erosion.
After the 2019 flood damaged the road embankment, Iowa DOT selected anchored concrete-block matting and evaluated recurring-damage economics.
A heritage foundation was stabilized by carefully removing soil beneath its north side. Published post-intervention observations connect rotation, settlement and groundwater control.
An offshore airport on deep marine deposits combines accelerated consolidation with ongoing settlement observation and adjustable building supports. The operator publishes measured island subsidence and its mitigation approach.
| Title | Type | Owner / location | Year | Access |
|---|---|---|---|---|
| Teton Dam — internal erosion and first-filling investigation | Forensic investigation | US Bureau of ReclamationEastern Idaho | 1976 | Study materials |
| Olmsted Locks and Dam — marine construction and project controls | Design and construction | US Army Corps of EngineersOhio River, Illinois–Kentucky | 2018 | Study materials |
| Oso SR 530 landslide — investigation and mitigation planning | Forensic investigation | USGS investigation with university and state partnersSnohomish County, Washington | 2014 | Study materials |
| Mud Creek, Highway 1 — landslide mapping and road recovery | Forensic investigation | Caltrans / USGS and NASA investigation partnersBig Sur, California | 2017 | Study materials |
| I-70 Grizzly Creek — post-fire rockfall risk and betterment | Rehabilitation | Colorado Department of TransportationGlenwood Canyon, Colorado | 2021 | Original documents |
| US 64 Ocoee Gorge — emergency rockslide stabilization | Rehabilitation | Tennessee Department of TransportationPolk County, Tennessee | 2010 | Study materials |
| 17th Street Canal — floodwall failure and reevaluation | Forensic investigation | US Army Corps of EngineersNew Orleans, Louisiana | 2005 | Study materials |
| Lower San Fernando Dam — liquefaction and post-earthquake stability | Forensic investigation | Los Angeles Department of Water and Power; USACE/USGS investigationsLos Angeles, California | 1971 | Study materials |
| Canterbury residential ground-improvement trials | Field demonstration | New Zealand building ministry and trial partnersChristchurch, Canterbury | 2012 | Study materials |
| Milltown Reservoir — dam removal and contaminated sediment remediation | Remediation and restoration | US EPA / Montana and responsible-party partnersMissoula County, Montana | 2009 | Study materials |
| Prototype Hanford Barrier — long-term infiltration control | Field demonstration | US Department of Energy / PNNLHanford Site, Washington | 2024 | Study materials |
| Ball State University — campus ground-source borefields | Design and construction | Ball State UniversityMuncie, Indiana | 2012 | Study materials |
| Inuvik–Tuktoyaktuk Highway — embankment over permafrost | Design and construction | Government of the Northwest TerritoriesNorthwest Territories | 2017 | Study materials |
| Dalton Highway MP 209–222 — air-convection embankment trial | Field demonstration | Alaska Department of Transportation and Public FacilitiesAlaska | 2022 | Study materials |
| KY 499, Estill County — pavement swelling investigation | Forensic investigation | Kentucky Transportation Cabinet / University of KentuckyEstill County, Kentucky | 2005 | Study materials |
| Texas SH 6 and SH 21 — expansive-subgrade distress | Forensic investigation | Texas Department of Transportation / Texas A&MTexas | 1996 | Study materials |
| Block Island Wind Farm — pile foundations and measured stiffness | Design and construction | Deepwater Wind / project partnersOffshore Rhode Island | 2016 | Study materials |
| Schoharie Creek Bridge — scour and foundation inspection | Forensic investigation | New York State Thruway AuthorityNear Amsterdam, New York | 1987 | Original documents |
| US 231, Lacey Springs — bridging a moving landslide | Rehabilitation | Alabama Department of TransportationLacey Springs, Alabama | 2020 | Original documents |
| Beaver Dam Wash Bridge — scour-resistant replacement | Rehabilitation | Mohave County Public WorksMohave County, Arizona | 2005 | Original documents |
| US 98, Florida — coastal roadway revetment | Rehabilitation | Florida Department of TransportationFlorida Panhandle | 2018 | Original documents |
| US 34, Iowa — flood-resistant embankment matting | Rehabilitation | Iowa Department of TransportationMills County, Iowa | 2021 | Original documents |
| Leaning Tower of Pisa — controlled underexcavation | Design, construction and performance | Italian Government / Opera della Primaziale PisanaPisa | 2008 | Study materials |
| Kansai International Airport — reclamation and long-term settlement | Design, construction and performance | Kansai AirportsOsaka Bay | 2025 | Study materials |
Each case separates documented project decisions and available records from a suggested capstone exercise. Missing final designs, costs, schedules or completion records are identified. A teaching exercise may require additional assumptions, site investigation or instructor-supplied inputs.
Projects may address several topics. Counts below represent relevant project records, not independent examples for every method.