Foundation Design · Cases

Find Engineering Cases

Documented projects, design decisions and lessons for engineering practice and capstone studies.

Owner, location & access
Clear filters

117 of 117 project case studies

The Mud Creek landslide on California’s Big Sur coast in May 2017.

Caltrans / USGS and NASA investigation partners · 2017

Mud Creek, Highway 1 — landslide mapping and road recovery

Repeat topographic and radar observations document the coastal landslide that destroyed part of Highway 1 in May 2017 and the continuing changes around its margins.

Soil slopes and landslidesCoastal and offshore foundationsMonitoring and observational design
The Ocoee Gorge rockslide site on 20 November 2009, with the source author’s marked instability zones retained.

Tennessee Department of Transportation · 2010

US 64 Ocoee Gorge — emergency rockslide stabilization

Rockslides near Ocoee Dam 2 required rock removal, bolting and stabilization while weather and difficult access affected the reopening programme.

Rock slopes and foundationsSoil slopes and landslidesRetaining walls and anchors
Aerial photograph of liquefaction at QEII Park and its surroundings on 11 March 2011. This records the site context before the later ground-improvement trials, not the trial construction.

New Zealand building ministry and trial partners · 2012

Canterbury residential ground-improvement trials

The 2012 trials compared shallow rafts, mixing columns, a perimeter curtain and densification approaches to support residential foundation repair and rebuilding.

Ground improvementEarthquakes and liquefactionShallow foundations
Annotated aerial photograph of the completed Prototype Hanford Barrier in August 1994.

US Department of Energy / PNNL · 2024

Prototype Hanford Barrier — long-term infiltration control

Long-term monitoring examines an evapotranspiration-capillary barrier intended to limit infiltration into waste. The annual report also discusses side-slope edge effects.

Contaminated ground and waste barriersSeepage and internal erosionMonitoring and observational design
Observed pavement distortion on KY 499 in Estill County, Kentucky, documented in the swelling investigation report.

Kentucky Transportation Cabinet / University of Kentucky · 2005

KY 499, Estill County — pavement swelling investigation

Field and laboratory work investigated heave of a relatively young pavement over compacted clay shale and distinguished wetting expansion from a suspected sulfate reaction.

Expansive, collapsible and organic soilsLaboratory testing and parametersEarthworks and pavement subgrades
The SH 6 study section in the original expansive-subgrade investigation, reproduced from the scanned Figure 6 photograph. The source scan has limited image quality.

Texas Department of Transportation / Texas A&M · 1996

Texas SH 6 and SH 21 — expansive-subgrade distress

A TxDOT-funded project investigated swelling clay beneath distressed pavement sections and evaluated characterization and stabilization alternatives.

Expansive, collapsible and organic soilsLaboratory testing and parametersEarthworks and pavement subgrades
The completed US 231 bridges at Lacey Springs span the unstable slope, shown in the FHWA case study’s Figure 3.

Alabama Department of Transportation · 2020

US 231, Lacey Springs — bridging a moving landslide

After a rainfall-triggered slide, ALDOT selected two bridges across the unstable area rather than reconstructing the road on the moving embankment.

Soil slopes and landslidesPiles and drilled shaftsLateral foundations and interaction
The articulating concrete-block revetment beside US 98 in Florida, shown in Figure 3 of the FHWA case study.

Florida Department of Transportation · 2018

US 98, Florida — coastal roadway revetment

Following Hurricane Michael, roadway reconstruction incorporated articulated concrete blocks over filter fabric and bedding to reduce recurring embankment erosion.

Scour and erosion protectionCoastal and offshore foundationsReinforced soil and geosynthetics
Cracked pavement, washed-out embankment and displaced roadway on US 34 after flooding.

Iowa Department of Transportation · 2021

US 34, Iowa — flood-resistant embankment matting

After the 2019 flood damaged the road embankment, Iowa DOT selected anchored concrete-block matting and evaluated recurring-damage economics.

Scour and erosion protectionEarthworks and pavement subgradesReinforced soil and geosynthetics
The Leaning Tower of Pisa after the stabilization works.

Italian Government / Opera della Primaziale Pisana · 2008

Leaning Tower of Pisa — controlled underexcavation

A heritage foundation was stabilized by carefully removing soil beneath its north side. Published post-intervention observations connect rotation, settlement and groundwater control.

Shallow foundationsSettlement and consolidationDewatering and groundwater
Satellite view of Kansai International Airport and its reclaimed offshore island works.

Kansai Airports · 2025

Kansai International Airport — reclamation and long-term settlement

An offshore airport on deep marine deposits combines accelerated consolidation with ongoing settlement observation and adjustable building supports. The operator publishes measured island subsidence and its mitigation approach.

Settlement and consolidationGround improvementExpansive, collapsible and organic soils

From project evidence to a design study

Each case separates documented project decisions and available records from a suggested capstone exercise. Missing final designs, costs, schedules or completion records are identified. A teaching exercise may require additional assumptions, site investigation or instructor-supplied inputs.

Topic coverage

Projects may address several topics. Counts below represent relevant project records, not independent examples for every method.