Foundation Design · Cases

Find Engineering Cases

Documented projects, design decisions and lessons for engineering practice and capstone studies.

Owner, location & access
Clear filters

117 of 117 project case studies

Bowman Road Bridge approximately 4.5 years after construction, as published in FHWA’s GRS-IBS synthesis (Figure 23).

Defiance County · 2005

Bowman Road Bridge — reinforced-soil abutments

The first production GRS integrated bridge system used reinforced-soil abutments. FHWA publishes a worked Bowman Road design and subsequent performance discussion.

Reinforced soil and geosyntheticsShallow foundationsSettlement and consolidation
The completed Founders/Meadows Bridge and its reinforced-soil approaches, viewed from the southwest. Original project photograph in Report 1, Figure B-3.

Colorado Department of Transportation · 1999

Founders/Meadows Bridge — footings on reinforced soil

The bridge and approach roadway were supported on geosynthetic-reinforced segmental walls. A material-testing and instrumentation programme followed the experimental arrangement.

Reinforced soil and geosyntheticsShallow foundationsLaboratory testing and parameters
The 100 South utility corridor during the Salt Lake City I-15 reconstruction, shown in the project authors’ Figure 2.

Utah Department of Transportation · 2001

I-15 reconstruction — soft-ground embankments and geofoam

Rapid highway reconstruction over soft lacustrine soils used geofoam, lime-cement columns, vertical drains, surcharge and staged MSE construction. UDOT reports ten-year performance.

Settlement and consolidationGround improvementReinforced soil and geosynthetics
Aerial view of the completed Woodrow Wilson Memorial Bridge over the Potomac River, March 2012.

Virginia DOT / Maryland State Highway Administration · 2008

Woodrow Wilson Bridge — foundation selection and testing

Technical project papers describe foundation alternatives and the new bridge foundations, including seismic soil–structure interaction and scour considerations.

Piles and drilled shaftsLateral foundations and interactionSite investigation
Microcamera photograph of defective concrete inside a Route 288 drilled shaft, from the project evaluation paper’s Figure 9. This is the actual shaft inspection, rather than an exterior bridge view.

Virginia Department of Transportation · 2004

Virginia Route 288 — drilled-shaft quality evaluation

This design-build highway case documents drilled-shaft assessment using crosshole sonic logging and pile-integrity tests, including construction anomalies.

Piles and drilled shaftsSite investigationMonitoring and observational design
Production micropiles installed under limited headroom at one of the New Jersey Turnpike bridge retrofits. Original Figure 3 from the project authors’ 2008 paper.

New Jersey highway agencies; see source · 2008

New Jersey Turnpike bridges — micropile underpinning

Four bridge retrofits used hollow-core bar micropiles under limited headroom after deterioration of exposed precast piles. The submitted case includes proof and verification tests.

Piles and drilled shaftsScour and erosion protectionMonitoring and observational design
Aerial photograph of the completed soil-nailed walls along River Road in Pima County, Arizona. The original Google attribution remains in the image.

Pima County Department of Transportation · 2004

River Road, Tucson — tall soil-nailed cuts

Road widening beneath developed bluffs used tall soil-nailed walls. Loose seams and constrained investigation access required construction responses.

Retaining walls and anchorsExcavation supportSite investigation
Vertical-drain construction on the US 14 embankment project near Nicollet, Minnesota.

Minnesota Department of Transportation · 2016

US 14 near Nicollet — preload and vertical drains

A highway embankment over organic clay used vertical drains, surcharge and staged filling, with remote monitoring of pore pressure and settlement.

Settlement and consolidationGround improvementExpansive, collapsible and organic soils
Concrete barrier-wall construction in the Wolf Creek Dam embankment on May 2, 2012.

US Army Corps of Engineers · 2013

Wolf Creek Dam — karst-foundation cutoff wall

A deep concrete barrier and associated grouting addressed seepage through the dam’s karst foundation. USACE documents completion and project scope.

Dams and leveesSeepage and internal erosionRock slopes and foundations

From project evidence to a design study

Each case separates documented project decisions and available records from a suggested capstone exercise. Missing final designs, costs, schedules or completion records are identified. A teaching exercise may require additional assumptions, site investigation or instructor-supplied inputs.

Topic coverage

Projects may address several topics. Counts below represent relevant project records, not independent examples for every method.