Foundation Design · Cases

Find Engineering Cases

Documented projects, design decisions and lessons for engineering practice and capstone studies.

Owner, location & access
Clear filters

43 of 117 project case studies

Bowman Road Bridge approximately 4.5 years after construction, as published in FHWA’s GRS-IBS synthesis (Figure 23).

Defiance County · 2005

Bowman Road Bridge — reinforced-soil abutments

The first production GRS integrated bridge system used reinforced-soil abutments. FHWA publishes a worked Bowman Road design and subsequent performance discussion.

Reinforced soil and geosyntheticsShallow foundationsSettlement and consolidation
The 100 South utility corridor during the Salt Lake City I-15 reconstruction, shown in the project authors’ Figure 2.

Utah Department of Transportation · 2001

I-15 reconstruction — soft-ground embankments and geofoam

Rapid highway reconstruction over soft lacustrine soils used geofoam, lime-cement columns, vertical drains, surcharge and staged MSE construction. UDOT reports ten-year performance.

Settlement and consolidationGround improvementReinforced soil and geosynthetics
Microcamera photograph of defective concrete inside a Route 288 drilled shaft, from the project evaluation paper’s Figure 9. This is the actual shaft inspection, rather than an exterior bridge view.

Virginia Department of Transportation · 2004

Virginia Route 288 — drilled-shaft quality evaluation

This design-build highway case documents drilled-shaft assessment using crosshole sonic logging and pile-integrity tests, including construction anomalies.

Piles and drilled shaftsSite investigationMonitoring and observational design
Production micropiles installed under limited headroom at one of the New Jersey Turnpike bridge retrofits. Original Figure 3 from the project authors’ 2008 paper.

New Jersey highway agencies; see source · 2008

New Jersey Turnpike bridges — micropile underpinning

Four bridge retrofits used hollow-core bar micropiles under limited headroom after deterioration of exposed precast piles. The submitted case includes proof and verification tests.

Piles and drilled shaftsScour and erosion protectionMonitoring and observational design
Vertical-drain construction on the US 14 embankment project near Nicollet, Minnesota.

Minnesota Department of Transportation · 2016

US 14 near Nicollet — preload and vertical drains

A highway embankment over organic clay used vertical drains, surcharge and staged filling, with remote monitoring of pore pressure and settlement.

Settlement and consolidationGround improvementExpansive, collapsible and organic soils
Concrete barrier-wall construction in the Wolf Creek Dam embankment on May 2, 2012.

US Army Corps of Engineers · 2013

Wolf Creek Dam — karst-foundation cutoff wall

A deep concrete barrier and associated grouting addressed seepage through the dam’s karst foundation. USACE documents completion and project scope.

Dams and leveesSeepage and internal erosionRock slopes and foundations
The Ocoee Gorge rockslide site on 20 November 2009, with the source author’s marked instability zones retained.

Tennessee Department of Transportation · 2010

US 64 Ocoee Gorge — emergency rockslide stabilization

Rockslides near Ocoee Dam 2 required rock removal, bolting and stabilization while weather and difficult access affected the reopening programme.

Rock slopes and foundationsSoil slopes and landslidesRetaining walls and anchors
The completed US 231 bridges at Lacey Springs span the unstable slope, shown in the FHWA case study’s Figure 3.

Alabama Department of Transportation · 2020

US 231, Lacey Springs — bridging a moving landslide

After a rainfall-triggered slide, ALDOT selected two bridges across the unstable area rather than reconstructing the road on the moving embankment.

Soil slopes and landslidesPiles and drilled shaftsLateral foundations and interaction
The articulating concrete-block revetment beside US 98 in Florida, shown in Figure 3 of the FHWA case study.

Florida Department of Transportation · 2018

US 98, Florida — coastal roadway revetment

Following Hurricane Michael, roadway reconstruction incorporated articulated concrete blocks over filter fabric and bedding to reduce recurring embankment erosion.

Scour and erosion protectionCoastal and offshore foundationsReinforced soil and geosynthetics
Cracked pavement, washed-out embankment and displaced roadway on US 34 after flooding.

Iowa Department of Transportation · 2021

US 34, Iowa — flood-resistant embankment matting

After the 2019 flood damaged the road embankment, Iowa DOT selected anchored concrete-block matting and evaluated recurring-damage economics.

Scour and erosion protectionEarthworks and pavement subgradesReinforced soil and geosynthetics
Construction of the Marina Bay Sands resort in Singapore.

Marina Bay Sands · 2010

Marina Bay Sands — deep foundations on reclaimed ground

The integrated resort was constructed on reclaimed waterfront land. The foundation contractors describe bored piling and advance removal of a buried seawall within a tightly constrained site.

Piles and drilled shaftsExcavation supportDewatering and groundwater

From project evidence to a design study

Each case separates documented project decisions and available records from a suggested capstone exercise. Missing final designs, costs, schedules or completion records are identified. A teaching exercise may require additional assumptions, site investigation or instructor-supplied inputs.

Topic coverage

Projects may address several topics. Counts below represent relevant project records, not independent examples for every method.